Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1. Work Breakdown Structure for the First Phase. <br /> <br /> <br />CACHE LA POUDRE AT GREELEY, COLORADO <br />COST ESTIMATE TO DECISION POINT 1 <br />(Mav 2005\ <br />Work Item Cost Estimates <br /> ($\ <br /> Corps In-Kind Total <br />Cultural Resources Assessment $1,688 $0 $1,688 <br />Environmental Studies $44,596 $0 $44,596 <br />Economic Studies $42,666 $1,600 $44,266 <br />Real Estate Studies $29,266 $13,820 $43,086 <br />Hydrologic Studies $42,090 $2,400 $44,490 <br />Flood Plain Management Studies $12,576 $600 $13,176 <br />Hydraulic Studies $80,380 $8,900 $89,280 <br />Geotechnical Studies $15,020 $2,400 $17,420 <br />HTRW Baseline Study $10,000 $0 $10,000 <br />Surveys and Mapping $12,150 $3,600 $15,750 <br />Structural Studies $0 $0 $0 <br />Project Cost Estimates $9,290 $0 $9,290 <br />Constructability Review $0 $0 $0 <br />Plan Form & Project Management $61,350 $13,020 $74,370 <br />Programs Management $3,611 $0 $4,074 <br />Federal Audit $0 $0 $0 <br />Value Engineering $0 $0 $0 <br />Required Washington level Review $10,000 $0 $10,000 <br />SUBTOTAL $374,683 $46,340 $421,486 <br />Contingency (approx 15%) $56,202 $6,951 $63,223 <br />PHASE 1 STUDY COST $430,885 $53,291 $484,709 <br /> <br />11 <br />