My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06961
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:28 PM
Creation date
10/5/2006 2:37:11 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Littleton
Stream Name
Massey Draw and SJCD South
Basin
South Platte
Title
Conceptual Design Report for Massey Draw and SJCD (South) Mjor Drainageway Planning Update
Date
2/1/2006
Prepared For
Jefferson County
Prepared By
Olsson Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ENGINEERS. PlANNER5. SCIENTISTS. SURVEYORS <br /> <br />Construction observation / testing: 10% <br />Legal/ administration: 5% <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />0\. <br /> <br />Massey Draw and SJCD Update <br />Project Meeting Minutes <br />June 9, 2004 <br />Page 2 of 2 <br /> <br />OLSSON ASSOCIATES <br /> <br />143 Union Blvd. Suite 700 Lakewood, CO 80228720-962-6072 <br /> <br />4, Regarding land acquisition costs, Paula will check into appropriate costs for the area. <br /> <br />MEETING MINUTES <br /> <br />5, The alternatives under consideration for each reach as presented in the alternatives <br />matrix were discussed. Comments made during the discussion will be considered or <br />evaluated and incorporated into the draft Phase A report. <br /> <br />6, OA will complete the draft Phase A report and submit it in two weeks. OA will <br />conduct the survey upstream of Wadsworth on Massey Draw and continue to refine <br />the FHAD mapping, <br /> <br />Massey Draw and SJCD (South) Update <br />OA Project No. 02-2003-1321 <br />June 9, 2004 <br /> <br />Attendees: <br /> <br />Alecia Cope - Jefferson County <br />Bob Deeds - City of Littleton <br />Paula Lundquist - Jefferson County <br />Ben Urbonas - Urban Drainage and Flood Control District (UDFCD) <br />Sean Warren - Ken-Caryl Ranch <br />Bruce Buttner - Olsson Associates (OA) <br />David Krickbaum - Olsson Associates <br />Deb Ohlinger - Olsson Associates <br /> <br />7. The next meeting will be held approximately one month after the submittal of the <br />draft Phase A report, The date will be set later. <br /> <br />1. A map showing areas of additional mapping needs for the Flood Hazard Area <br />Delineation (FHAD) was submitted to Ben. Ben noted that an addendum for OA to <br />do a small amount of additional surveying upstream of Wadsworth on Massey Draw <br />should arrive today. Paula will facilitate contact with the landowners in that area for <br />access to the properties. <br /> <br />cc: Attendees via e-mail <br />Tim Carey via e-mail <br />Melissa Chew via e-mail <br />Russ Clayshulte via e-mail <br />Scott Franklin via e-mail <br />Bill Kieck via e-mail <br />Larry Lang via e-mail <br />John Liou <br />Rick McLoud via e-mail <br />Larry Mugler via e-mail <br />Gene Reetz <br />Justin Werdel via e-mail <br />Kent Wiley <br />Paul Winkle <br /> <br />Minutes Additions/Corrections: None <br /> <br />Items Distributed: <br /> <br />. Alternatives evaluation criteria <br />. Updated alternatives matrix <br /> <br />Discussion Items: <br /> <br />2. During discussion of the evaluation criteria, Ben noted that the costs must be <br />weighed against the benefits in terms of flood reduction, flood frequency and road <br />overtopping reduction, comparison with average annual damages, etc. David raised <br />the question of criteria for sizing sediment basins, Ben commented that we might <br />want to consider a basin on Massey for bedload control. He also said that a basin <br />should only be considered for a given location if it will fit and provide some benefit. <br /> <br />3, Soft costs to be included in the cost of alternatives in the Phase A report were as <br />follows. It is anticipated that the contingencies can be reduced to 15% for the Phase <br />B report. <br /> <br />Contingencies: <br />Engineering: <br /> <br />25% <br />15% <br />
The URL can be used to link to this page
Your browser does not support the video tag.