Laserfiche WebLink
<br />7, The next meeting was scheduled for February 18, 2004, 9:00 at Olsson Associates' <br />office. <br /> <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br /> <br />0\. <br /> <br />Massey Draw and SJCD Update <br />Project Meeting Minutes <br />January 28, 2004 <br />Page 2 of 2 <br /> <br />OLSSON ASSOCIATES <br /> <br />ENGINEERS' PLANNERS' SCIENTISTS' SUflVEYORS <br /> <br />143 Union Blvd. Suite 700 Lakewood, CO 80228720-962.6072 <br /> <br />MEETING MINUTES <br /> <br />5, Two models will be prepared for the study. The first will be a calibration model, which <br />will include the existing Ken Caryl detention basins that are located west of the hogback. <br />This model will be calibrated to approximate the flows from the Flood Insurance Study <br />and the 1985 UDFCD memorandum. The second model will be a baseline model, which <br />will include the detention basin on Massey Draw upstream of Carr Street, and the <br />detention basin on SJCD (South) that is located in the Sanctuary, upstream of Kipling <br />Street. UDFCD approved the Sanctuary detention basin for maintenance eligibility. The <br />baseline model will include future land use conditions. Since the watershed is almost <br />built out, it was agreed that an existing land use condition model is not needed. <br /> <br />Massey Draw and SJCD (South) Update <br />OA Project No. 02-2003-1321 <br />January 28, 2004 <br /> <br />Attendees: <br /> <br />Ben Urbonas - Urban Drainage and Flood Control District <br />Paula Lundquist - Jefferson County <br />Alecia Cope - Jefferson County <br />Bob Deeds - City of Littleton <br />Larry Mugler - Denver Regional Council of Governments <br />Scott Franklin - Corps of Engineers <br />Rick McLoud - Centennial Water and Sanitation District <br />Justin Werdel- CDOT R6 Hydraulics <br />Sean Warren - Ken Caryl Ranch Master Association <br />Bruce Buttner - Olsson Associates <br />David Krickbaum - Olsson Associates <br />Dana Carter - Olsson Associates <br /> <br />6, Justin Werdel will provide information regarding the culverts along C470, as well as the <br />names of contacts for the environmental impact study that is being prepared for C470. <br /> <br />1. David Krickbaum gave a project overview, with a brief description of the problem areas <br />that were initially identified in the watershed, <br /> <br />cc: Attendees via e-mail <br />Russ Clayshulte via e-mail <br />Paul Winkle <br />Kent Wiley <br />Larry Lang via e-mail <br />Gene Reetz <br />John Liou <br />Bill Kieck via e-mail <br />Melissa Chew via e-mail <br />Tim Carey via e-mail <br /> <br />Discussion Items: <br /> <br />2, Sean Warren questioned why the study is not extending past the Hogback, The Ken <br />Caryl area is experiencing channel erosion problems. He added that a hazard study <br />was done in 1997 that identified several problems in Massey Draw west of the Hogback, <br />Paula Lundquist explained that the developer did not submit the drainage improvements <br />to Urban Drainage and Flood Control District (UDFCD) for approval and are not eligible <br />for UDFCD maintenance, Therefore, any drainage improvements would have to be <br />constructed as a capital improvement project. The County does not believe that using <br />public money for projects on private open space is a good use of public funds. The <br />UDFCD master planning process, capital improvement and maintenance programs were <br />further explained. Sean will discuss this further with the County and UDFCD. <br /> <br />3, The watershed delineations will be sent to Ben Urbonas for review. The NRCS soils <br />information shows the area contains mostly hydrologic group c and D soils. <br /> <br />4. Paula will provide the South Jefferson County Community Plan for identifying future land <br />uses. The Jefferson County GIS land use data will be used and supplemented to reflect <br />recent development that has occurred. <br />