My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06961
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:28 PM
Creation date
10/5/2006 2:37:11 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Littleton
Stream Name
Massey Draw and SJCD South
Basin
South Platte
Title
Conceptual Design Report for Massey Draw and SJCD (South) Mjor Drainageway Planning Update
Date
2/1/2006
Prepared For
Jefferson County
Prepared By
Olsson Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />. <br />. <br />I <br />I <br />. <br />. <br />,. <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br /> <br />0\. <br /> <br />Massey Draw and SJCD Update <br />Project Meeting Minutes <br />January 7,2004 <br />Page 2 of 2 <br /> <br />OLSSON ASSOCIATES <br /> <br />EN G I NE E RS' PLANN E RS . SCI E NTISTS' SU RVEVORS <br /> <br />143 Union Blvd. Suite 700 Lakewood, CO 80228720-962-6072 <br /> <br />6. Paula Lundquist provided County GIS data. She will also provide the drainage studies <br />for the Ken Caryl, the Deer Creek Golf Club and the Meadows Sanctuary, She will also <br />provide a current aerial photograph. <br /> <br />7. The State Engineer approved the plans for the South Platte Reservoir project in June <br />2003, The plans include a channel designed to convey the probable maximum flood, <br />downstream of South Platte Canyon Road. These channel improvements will be <br />incorporated into the Massey Draw update. Tetra Tech I RMC prepared the construction <br />plans, and can be contacted to obtain a set of the final plans (Don Deere, 303/772- <br />5282), <br /> <br />MEETING MINUTES <br /> <br />Massey Draw and SJCD (South) Update <br />OA Project No. 02-2003-1321 <br />January 7,2004 <br /> <br />Attendees: <br /> <br />Ben Urbonas - Urban Drainage and Flood Control District <br />Paula Lundquist - Jefferson County <br />Alecia Cope. - Jefferson County <br />Bob Deeds - City of Littleton <br />Bruce Buttner - Olsson Associates <br />David Krickbaum - Olsson Associates <br />Dana Carter - Olsson Associates <br /> <br />8. Bob Deeds provided plans for the existing SJCD North Tributary improvements, <br />downstream of South Platte Canyon Road, A portion of the tributary, upstream of South <br />Platte Canyon Road, is in Arapahoe County. Dave Mallory (UDFCD) or Steve Gardner <br />(Arapahoe County) should be able to provide information for those improvements, <br /> <br />9. A list of possible project participants was reviewed, Ben Urbonas will send letters to the <br />people and/or agencies determined to have an interest inviting them to the next meeting. <br /> <br />10. David noted that the structure inventory does not include structures 23 through 45. Ben <br />will check to see if it has been done. <br /> <br />Discussion Items: <br /> <br />1. Urban Drainage and Flood Control District (UDFCD) has rainfall data and peak flow <br />estimates for the storm that occurred in August 1999, The accuracy of the rainfall data <br />is unknown. When the models for Massey Draw are complete, UDFCD will run the <br />models with the datasets to compare the results against the estimates. UDFCD also has <br />photos from August 1999 that can be inserted into the report to provide a history of <br />flooding, <br /> <br />11. Ben requested that the schedule be reviewed and that future meetings be scheduled <br />base on speCific tasks. <br /> <br />12. The next meeting was scheduled for January 28, 2004, 9:00 at Olsson Associates' <br />office. <br /> <br />cc: Attendees via e-mail <br /> <br />2. The Chatfield Water Quality grant application agreements have been executed with the <br />State and the District. They are moving ahead with the final design. Dave Lloyd can <br />provide further information about the project. The final design of the Chatfield Water <br />Quality project will be incorporated into the master plan. <br /> <br />3. The project notice to proceed date is December 29, 2003. A Flood Hazard Area <br />Delineation Report has been added to the scope with Addendum NO.1. Olsson <br />Associates (OA) signed the Addendum and returned it to UDFCD. Ben Urbonas will <br />check on the status of the Addendum, <br /> <br />4. The project schedule was distributed and includes the FHAD. A watershed tour is <br />shown on the schedule, but the date will be finalized later. <br /> <br />5, OA has begun work on the watershed delineations. The USGS digital elevation models <br />are being used for the delineation and will be field verified so that flow pattern changes <br />caused by development can be accounted for. The delineation will be reviewed with <br />UDFCD when finished. <br />
The URL can be used to link to this page
Your browser does not support the video tag.