Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />0\ <br /> <br />Massey Draw and SJCD Update <br />Project Meeting Minutes <br />February 18. 2004 <br />Page 2 of 2 <br /> <br />OLSSON ASSOCIATES <br /> <br />4. Justin Werdel provided copies of the culvert information and calculations for the culverts <br />located along C-470. <br /> <br />5. Paula also provided a copy of a land use map for southern Jefferson County. She noted <br />that the community plan for South Jefferson County would be updated later this year. <br />The changes are anticipated to be minor and will not have a significant impact on the <br />master plan update. It was agreed that the master plan update will use the current land <br />use map <br /> <br />ENGINEEIlS' f'lANNERS' SCIENTISTS' SURVEYORS <br /> <br />143 Union Blvd. Suite 700 Uikewood. CO 80228720.962-6072 <br /> <br />MEETING MINUTES <br /> <br />Massey Draw and SJCD (South) Update <br />OA Project No. 02-2003-1321 <br />February 18, 2004 <br /> <br />Attendees: <br /> <br />6. The next meeting will include a preliminary discussion existing problems and <br />alternatives. The meeting will be on March 2, 2004, 9:00 at Olsson Associates' office. <br /> <br />Ben Urbonas - Urban Drainage and Flood Control District <br />Paula Lundquist - Jefferson County <br />Alecia Cope - Jefferson County <br />Bob Deeds - City of Littleton <br />Justin Werdel - CDOT Region 6 Hydraulics <br />Bruce Buttner - Olsson Associates <br />David Krickbaum - Olsson Associates <br />Dana Carter - Olsson Associates <br /> <br />cc: Attendees via e-mail <br />Russ Clayshulte via e-mail <br />Paul Winkle <br />Kent Wiley <br />Larry Lang via e-mail <br />Gene Reetz <br />John Liou <br />Bill Kieck via e-mail <br />Melissa Chew via e-mail <br />Tim Carey via e-mail <br />Larry MU91er via e-mail <br />Rick McLoud via e-mail <br />Scott Franklin via e-mail <br />Sean Warren via e-mail <br /> <br />Discussion Items: <br /> <br />1, Preliminary results of the modeling were reviewed. By adjusting the depression loss and <br />soil infiltration parameters to those used for the Ken Caryl models. prepared by Muller <br />Engineering in 1984, the 1 OO-year discharges at the hogback are within 2% of the target <br />values from the 1985 Urban Drainage and Flood Control District memorandum. <br />However, in the lower reaches of Massey Draw, the North Tributary of Massey Draw and <br />SJCD (South) the 1 OO-year discharges are significantly higher than those contained in <br />the original master plan, A comparison of the watershed areas and composite <br />imperviousness between the original master plan and the update was presented, The <br />imperviousness values match reasonably well. The areas of the North Tributary of <br />Massey Draw and SJCD (South) are 16% and 28% greater, respectively, than those <br />shown in the master plan. Olsson Associates (OA) is reviewing the watershed <br />delineations to reconcile this difference. OA is also reviewing the modeling parameters <br />to determine why the discharges are different. <br /> <br />2, Ben noted that an imperviousness of 0% or 0,5% for open space areas could be used <br />instead of the typical 2% imperviousness, <br /> <br />3. OA is preparing fees to extend the study west of the hogback. Ben noted that the Ken <br />Caryl Master Association would contribute funds to extend the study. Paula stated that <br />Jefferson County is agreeable to extending the study, provided the extension does not <br />come at the sacrifice of lower parts of the watershed located in public areas. If the <br />master plan is extended, it is anticipated that it will be primarily a stabilization plan. Ben <br />noted that any improvements shown in the Ken Caryl area would need to take into <br />account maintenance access, similar to the rest of the study area. <br />