My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06925
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:22 PM
Creation date
10/5/2006 2:36:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Master Floodway Planning
Date
3/11/1983
Prepared For
Greeley
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />17 <br /> <br />I <br /> <br />Boulder Creek/South Boulder creek Confluence Area Major Drainageway Planning <br />~u~ <br /> <br />I <br /> <br />1 <br /> <br />This major drainageway study includes analysis of existing flooding <br /> <br /> <br />problems, selection of several alternative improvement designs including <br /> <br /> <br />hydraulic analysis of each alternative, cost-benefit analysis to determine the <br /> <br /> <br />economically feasible alternatives, and preliminary design of the selected <br /> <br /> <br />alternative. <br /> <br />I <br /> <br />I <br /> <br />The study area is a mix of commercial and industrial land uses. Flooding <br />problems are aggravated by numerous road and railroad crossings of the two <br />creeks and by the relatively flat terrain in the area. The City of Boulder is <br />planning an extension of Pearl Street to the confluence area and transpor- <br />tation planning for the extension is incorporated into the drainageway <br />improvement study. <br />A Phase A report is being prepared containing all existing flooding <br />information, conceptual designs of alternative improvement measures, residual <br />flooding problems associated with each alternative, and cost-benefit <br />analysis. Upon selection of the best suited alternative, a Phase B report <br />will be prepared. This report will include preliminary designs of the <br />selected alternative, detailed hydraulic analysis of the selected alternative, <br />and detailed cost estimates of the improvements divided into drainage costs, <br />road and railroad crossing costs, utility relocation costs, property acquisi- <br />tion costs, and operation and maintenance costs. <br />Project Period: February 1983 through Present <br />Project Budget: $30,000 <br />Reference: Mr. Ben Urbonas <br />Urban Drainage and Flood <br />Control District <br />2480 West 26th Avenue <br />Suite 156B <br />Denver, CO 80211 <br />(303) 455-6277 <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />'I <br /> <br />II <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.