Laserfiche WebLink
<br />. <br /> <br />12 <br /> <br />I <br />II <br />I <br /> <br />PROPOSED WORK SCHEDULE <br /> <br />Month <br /> <br />I <br /> <br />I <br /> <br /> Task 1 2 3 4 <br />1. Project coordination <br />2. Review of existing information -t <br />3. Field investigation >--t <br />4. Hydraulic analysis <br />5. Plan formulation and evaluation <br />6. Plan selection by City 1-----1 <br />7. Preliminary design <br />8. Report preparation <br />9. Review by City t---- ----t <br />10. Report revision and printing <br /> <br />I <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Tasks to be performed by the City. <br /> <br />I <br /> <br />Tasks to be performed by SLA. <br /> <br />. <br /> <br />I <br /> <br />. <br /> <br />. <br /> <br />. <br />I. <br />