Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />11 <br /> <br />depicted graphically with sufficient detail to allow development of final <br /> <br /> <br />construction drawings. <br /> <br /> <br />The draft report will be submitted to the City for review. Upon the <br /> <br /> <br />panel's review, all comments will be incorporated into the final report. The <br /> <br /> <br />final report will be prepared and 25 copies will be submitted to the City. <br /> <br /> <br />The report can be used for submittal to FEMA for floodplain map amendment. <br /> <br /> <br />A technical addendum will also be prepared including all technical infor- <br /> <br /> <br />mation developed through this study. <br /> <br />H. Work Schedule <br /> <br /> <br />As indicated in the RFP, the total study time shall not exceed four <br /> <br /> <br />months after a notice to proceed including review of the draft report by the <br /> <br /> <br />City. After careful review of the scope of work, SLA feels the total study <br /> <br /> <br />time is adequate with an experienced engineer assigned to the project full <br /> <br /> <br />time with adequate supervision and assistance from in-house specialists. A <br /> <br /> <br />proposed work scheduie is presented on the following page. <br />