My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06925
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:22 PM
Creation date
10/5/2006 2:36:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Master Floodway Planning
Date
3/11/1983
Prepared For
Greeley
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />11 <br /> <br />depicted graphically with sufficient detail to allow development of final <br /> <br /> <br />construction drawings. <br /> <br /> <br />The draft report will be submitted to the City for review. Upon the <br /> <br /> <br />panel's review, all comments will be incorporated into the final report. The <br /> <br /> <br />final report will be prepared and 25 copies will be submitted to the City. <br /> <br /> <br />The report can be used for submittal to FEMA for floodplain map amendment. <br /> <br /> <br />A technical addendum will also be prepared including all technical infor- <br /> <br /> <br />mation developed through this study. <br /> <br />H. Work Schedule <br /> <br /> <br />As indicated in the RFP, the total study time shall not exceed four <br /> <br /> <br />months after a notice to proceed including review of the draft report by the <br /> <br /> <br />City. After careful review of the scope of work, SLA feels the total study <br /> <br /> <br />time is adequate with an experienced engineer assigned to the project full <br /> <br /> <br />time with adequate supervision and assistance from in-house specialists. A <br /> <br /> <br />proposed work scheduie is presented on the following page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.