My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06839
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:06 PM
Creation date
10/5/2006 2:32:58 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Fountain Creek CLOMR
Date
3/5/1998
Prepared For
Pueblo County
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />'" <br /> <br />Mr. Dennis Maroney <br />March 5, 1998 <br />Page three <br /> <br />than are 10-year old or 12-year old computer runs. <br />incorporated in the "Corrected Effective" analysis are <br />explanation offered for those changes. <br /> <br />Although the net changes <br />substantial, we accept the <br /> <br />FloodDlain Chane:es Attributable to the Hil!:hwav Proiect <br />The changes to the flood elevations that are a direct result of the highway project are <br />generally On the order of 4 inches or less, There is only one exception. The <br />reconfiguration of the intersection of Dillon Drive and 29" Street includes some <br />encroachment into the FIS floodway. The result is an increase of 0.75 foo~ (9 inches) in <br />the water surface. While we understand the physical constraints that necessitated this <br />particular project feature, we still wish there were a different way to addresst\1e traffic <br />situation at that intersection. For the remainder of the project, increases in flood <br />elevations are not a significant concern. <br /> <br />The post-project floodplain map does not look very different from the pre-project map. <br />The primary changes are that new roads or road features have converted some areas <br />formerly subject to 100-year flooding into areas subject to 500-year flooding. The <br />ground would be elevated at those locations as part of the project, and it would take more <br />water to inundate them. The overall difference in the maps is slight. <br /> <br />Comments <br />The combination of I) updating the floodplain mapping (as performed by CH2M HILL) <br />and 2) the proposed construction of the highway project for 1-25, U.S. Highway 50 and <br />State Highway 47 would result in 100-year flood elevations that are higher than those <br />shown in the 1986 FIS (generally 0-3 feet higher, with the datum adjustment). Most of <br />those changes are attributable to the "natural" channel geometry changes, but a small part <br />of the changes is attributable to the highway project. The changes in the floodplain <br />delineation would be minor. <br /> <br />The work by CH2M HILL indicates a strong likelihood that significant geologic <br />processes are underway on that reach of Fountain Creek. We recommend that the city, <br />perhaps in cooperation with the Colorado Department of Transportation, initiate a <br />monitoring system for this stream reach. A simple start would be to identify appropriate <br />locations for transects across the creek that would then be resurveyed on a regular basis to <br />see what is happening to channel geometry. The "Corrected Effective" channel geometry <br />could easily be compared to the FIS channel geometry to preliminarily determine critical <br />locations where significant geologic changes are going on. It is conceivable that such a <br />monitoring program should be integrated with the ongoing efforts of the Fountain Creek <br />Project housed at the Pikes Peak Area Council of Governments in Colorado Springs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.