My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06839
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:06 PM
Creation date
10/5/2006 2:32:58 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Fountain Creek CLOMR
Date
3/5/1998
Prepared For
Pueblo County
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-; <br /> <br />Mr. Dennis Maroney <br />March 5,1998 <br />Page four <br /> <br />The possibility of and the need for floodplain mapping of the unnamed west bank <br />tributary to Fountain Creek in the vicinity of Highway 47 should be investigated. It <br />appears that the information generated by CH2M HILL for the highway project would <br />provide a good starting point. It appeared that there might be existing or future facilities, <br />including buildings, that might be affected by this drainageway. We recommend that the <br />City of Pueblo consider the need for a master plan if future land use patterns in that area <br />indicate potential problems with storm drainage. <br /> <br />We feel that CH2M HILL has conducted a thorough study of the impacts of the proposed <br />highway project. We support the proposed CLOMR. Presuming that the project will be <br />constructed, we hope that FEMA would choose to implement a major Physical Map <br />Revision for the Pueblo FIS. The Physical Map Revision should include: 1) the LOMR <br />previously granted for the Fountain Creek Flood Control Project built by the Corps of <br />Engineers just downstream of the proposed highway project and 2) the LOMR that would <br />follow the completion of the highway project. Such a Physical Map Revision would give <br />you flood maps that reflect the hydraulic conditions in the1990's instead of the 1980's. <br /> <br />Please let me know if you have any questions or concerns about this letter. <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Brian R. Hyde <br /> <br />cc: Kim Headley, Pueblo County <br />Jeffrey Schulz, CH2M HILL <br />David Miller, COOT (Pueblo) <br />Garth Englund, COOT (Denver) <br />John Liou, FEMA Region VIII <br />Mike Grimm, FEMA Headquarters <br />
The URL can be used to link to this page
Your browser does not support the video tag.