My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06757
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:51 PM
Creation date
10/5/2006 2:29:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Alamosa
Community
Alamosa County
Stream Name
Rio Grande River
Basin
Rio Grande
Title
Alamosa Flood Control Project Phase I and II
Date
9/8/1986
Prepared For
Alamosa County
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:r:s":,a;~ ;Jlast~( pipe )bservl.!tj~,~, \-Ieils ir. the ~orinGs +'J>"' <br /> <br />~ <br /> <br />(o~:;nued water level mrnitoring. <br />Conduct a laboratory te..ting DrGgr~l~ to deternline the strength, <br />compressibility or swe'll characteristics, classification and <br />permeability of the m2terials L the site. The lab(lratory <br />testing ;Jrogram will evaluate the standard proflerties of :~e <br />eX1sting and proposed levee materials. Se1ected triax~al and <br />direct shear tests will be conducted as nec~ssary. <br />E. ~ecommendations will be presented for a slJitable configuration <br /> <br />'-.-- <br /> <br />of the Wp.st embankment based en the foundation conditiClns and <br />the materials available for c~>"'struction. The evaluation will <br />include estimates of settlement, slope stability and ;eepage <br />for the recommended configurations. It will be assumed that <br />borrow materi al wi 11 meet the requi rements of the Phase I Zone <br />1 materi a1. <br />7. A report will be prepared discussing the items above. The <br />investigation and report preparation will be conducted under <br />superviSion of a registered professional engineer. <br />8. The recommendations and re~ort will be reviewed with the <br />Geotechnical Section of the Albuquerque Branch of the Corps of <br />Engineers, and a response will be made to their comments. <br />g. The geoteChnical engineers will assist in the preparation of <br />plans, specifications, and cost estimates for the project. <br />They also wil' provide input as necessary on the geoteChnical <br />content of the pi ans such as the confi gurat i on of the levees. <br />They will also review the specifications from Phase] including <br />sections on foundati^n pre~aration, placement of embankment <br />materials and constructiorl of seepage control structures. <br />Modifications to the specifications will be made as necessary. <br />No borrow areas will be investigated as a part of this Phase ]1 <br />wcrk. Material characteristic of the borrow areas identified and <br />used in Phase] will be assumed to be aVailable for Phase II. In <br />the construction documents, tne Contractor will be given the <br />responsibility of locating acceptable borrow material. <br /> <br />B. Field Control. Survey and Base Maps. Donald O. Knapp. under <br />subcontract to MEe, will obtain tfle needed surveying for the <br />project. A survey traverse line wl,l be established along the <br />levee and will be used as the basis of control for the design and <br />construction work. The following work scope will be completed: <br /> <br />1. Estab11sh a base survey line on the west levee, which is <br />identifiable in the field and can be re-established at the time <br />of construction of the west levee, upstream of the U.S. 160 <br />bridge approximately 1,800 feet. <br />Z. Survey cross sections of the existing levee at locations <br />desi gnated by MEC and at intervals of lOO-feet along those <br />areas where construction work is to be completed. Cross <br />
The URL can be used to link to this page
Your browser does not support the video tag.