Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />20 <br /> <br />TABLE 5 <br /> <br />PRELIMINARY FLOOD CONTROL <br />PROJECT COST ESTIMATES FOR <br />ALTERNATIVE 2 <br /> <br />FEATURE <br /> <br />1. U.S. Hi9hway 6 Bridge Improvements <br /> <br />2. B.N.R.R. Bridge Improvements <br /> <br />3. Road and Channel Improvements <br />a. Upper Reach <br />b. North Fork Channel <br /> <br />4. County Road 2J Bridge and Paving <br /> <br />5. County Road 21 Spillway, Channel Improvements and Paving <br /> <br />Contingencies (10%) <br /> <br />Engineering & Administration (12% of construction <br />and contingencies) <br /> <br />ESTIMATED COST <br />$ 66,700.00 <br /> 56,700.00 <br /> 110,700.00 <br /> 180 , 1 68 .00 <br /> 384,240.00 <br /> 138,000.00 <br />$ 936,508.00 <br /> 93,651 .00 <br /> 123,619.00 <br />$ 1,153,778.00 <br />