Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />21 <br /> <br />TABLE 6 <br /> <br />PRELIMINARY FLOOD CONTROL <br />PROJECT COST ESTIMATES FOR <br />AL TERNATIVE 3 <br /> <br />Unit <br />Quantity Cost <br /> <br />1. U.S. Highway 6 Bridge and Local <br />Channel Improvements <br /> <br />2. B.N.R.R. Bridge and Local <br />Channel Improvements <br /> <br />3. Road and Channel Improvements <br />a. Upper Reach <br />a. Excavate, Compact and <br />Shape Levee <br />b. Riprap and Reclamation <br />b. North Fork Channel <br />1. Excavate and Haul <br />2. Shape and Compact Roads <br />3. Resurface East-West Road <br />4. Riprap and Reclamation <br /> <br />45,067 c.y. <br /> <br />32,500 c.y. <br />32,500 c.y. <br /> <br />Total <br /> <br />$ <br /> <br />66,700.00 <br /> <br />56,700.00 <br /> <br />2.22 100,000.00 <br /> 10,700.00 <br />1.50 48,800.00 <br />0.75 24,400.00 <br /> 20,000.00 <br /> 12,350.00 <br /> 210,000.00 <br /> 12,500.00 <br /> 35,000.00 <br /> ~ <br /> .251S'00'00 <br /> , <br /> S'SjOOO' 00 <br />1.50 31,029.00 <br />1.00 13,000.00 <br /> 35,185.00 <br /> <br />4. County Road 21 Bridge* <br />1. Structure <br />2. Approaches and Riprap <br />3. Remove old asphalt and <br />4 Dresurla~e road r I II i <br />. 0,,1I1s.(Y-LC<-...., ~n L.L W\ ~ <br />5. County Road 21 Spillway, Channel, RO~~ <br />Improvements and Resurfacing <br />a. Road and Spillway <br />1. Excavate and Haul 20,686 c.y. <br />2. Compact and Reshape 13,000 c.y. <br />3. Remove old asphalt and <br />resurface road <br />b. Outflow Channel <br />1. Excavate, Compact and <br />Shape Levee 19,500 c.y. 2.39 <br />2. Riprap and Reclamation <br /> <br />SUBTOTAL $ <br /> <br />Contingencies (10%) <br />Engineering & Administration (12%) <br /> <br />*TOTAL ESTIMATED COST WITH COUNTY ROAD 21 BRIDGE $ <br /> <br />SUBTOTAL WITHOUT COUNTY ROAD 21 BRIDGE $ <br />Contingencies (10%) <br /> <br />SUBTOTAL S <br />Eng. & Administration (12%) <br /> <br />*TOTAL ESTIMATED COST WITHOUT COUNTY ROAD 21 BRIDGE $ <br /> <br />46,686.00 <br />12,100.00 <br />735,150.00 <br />73,515.00 <br />97,039.00 <br />905,704.00 <br />477,650.00 <br />47,765.00 <br />525,415.00 <br />63,050.00 <br /> <br />588,465.00 <br />