Laserfiche WebLink
<br />Section 102. Inland Waterway Transportation <br /> <br />A. Construction Costs <br /> <br />One-half of the cost shall be paid from amounts <br />appropriated from the general fund and one-half shall be <br />paid from the Inland Waterways Trust Fund for the projects <br />authorized in this Act, including MRGO & LID 26. <br /> <br />B, O&M <br /> <br />The Federal share of O&M will. be 100~. <br /> <br />Secticn 103. Flood Control and Other Purposes <br />A. Flood Control <br /> <br />1. Non-Federal interests must agree to operate, maintain and <br />rehabilitate (OM&R) the project and are required to pay during <br />construction a minimum of 25~ of total cost assigned to flood <br />control including 5~ of costs in cash and LERRO <br /> <br />2. If 5~ cash plus LERRO exceed 30~ of the total cost assigned <br />to flood control, non-Federal interests may reimburse the excess <br />over 15 years. <br /> <br />3. The non-Federal share is limited to 50~. (consistent with prior <br />legislation) <br /> <br />4. For non-structural components involving relocation or evacuation <br />requiring land acquisition, the non-Federal share is limited to <br />25~, paid during construction. <br /> <br />B. Other Purposes <br /> <br />1. Non-Federal interests must agree to OM&R the project, provide <br />. LERRO and pay: <br /> <br />a. Hydroelectric power - 100~ reimbursable. <br /> <br />b. Municipal and industrial water supply - 100~ paid during <br />construction or reimbursable <br /> <br />c. Agricultural water supply - 35~ paid during construction or <br />reimbursable <br /> <br />d. Recreation - 50~ separable costs for all projects except <br />navigation; and 50~ separable and joint costs for navigation <br />projects, paid during construction or reimbursable <br /> <br />3 <br />