My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06200
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:14 PM
Creation date
10/5/2006 2:06:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Water Resources Development Act of 1986 - Federal
Date
11/7/1988
Prepared For
Water Resources Development Act of 1986
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Section 102. Inland Waterway Transportation <br /> <br />A. Construction Costs <br /> <br />One-half of the cost shall be paid from amounts <br />appropriated from the general fund and one-half shall be <br />paid from the Inland Waterways Trust Fund for the projects <br />authorized in this Act, including MRGO & LID 26. <br /> <br />B, O&M <br /> <br />The Federal share of O&M will. be 100~. <br /> <br />Secticn 103. Flood Control and Other Purposes <br />A. Flood Control <br /> <br />1. Non-Federal interests must agree to operate, maintain and <br />rehabilitate (OM&R) the project and are required to pay during <br />construction a minimum of 25~ of total cost assigned to flood <br />control including 5~ of costs in cash and LERRO <br /> <br />2. If 5~ cash plus LERRO exceed 30~ of the total cost assigned <br />to flood control, non-Federal interests may reimburse the excess <br />over 15 years. <br /> <br />3. The non-Federal share is limited to 50~. (consistent with prior <br />legislation) <br /> <br />4. For non-structural components involving relocation or evacuation <br />requiring land acquisition, the non-Federal share is limited to <br />25~, paid during construction. <br /> <br />B. Other Purposes <br /> <br />1. Non-Federal interests must agree to OM&R the project, provide <br />. LERRO and pay: <br /> <br />a. Hydroelectric power - 100~ reimbursable. <br /> <br />b. Municipal and industrial water supply - 100~ paid during <br />construction or reimbursable <br /> <br />c. Agricultural water supply - 35~ paid during construction or <br />reimbursable <br /> <br />d. Recreation - 50~ separable costs for all projects except <br />navigation; and 50~ separable and joint costs for navigation <br />projects, paid during construction or reimbursable <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.