My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06200
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:14 PM
Creation date
10/5/2006 2:06:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Water Resources Development Act of 1986 - Federal
Date
11/7/1988
Prepared For
Water Resources Development Act of 1986
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />.. <br />.-.~. <br /> <br />Section 1. Short Title and Table of Contents <br />"Water Resources Development Act of 1986" <br /> <br />Section 2. Definition of Secretary <br /> <br />TITLE I - COST SHARING <br /> <br />Section 101. Harbors <br /> <br />A. Construction <br /> <br />1. Non-Federal interests pay during construction 10~ of the cost of <br />general navigation facilities (GNF) for increment to depth of 20 <br />feet, <br /> <br />2. <br /> <br />Non-Federal interests pay during construction 25~ of the cost of <br />GNF for increment greater than 20 feet to a depth of 45 feet. <br />Non-Federal interests pay during construction 50~ of the cost of <br />GNF for increment greater than 45 feet. <br /> <br />3. <br /> <br />4. Additionally, non-Feds pay 10~ of. the cost of GNF over 30 years, <br />however, for each non-Federal dollar value of contributed lands, <br />easements, rights-of-way, relocations, and dredged material <br />disposal (LERRD), there will be a dollar credit against this 10~. <br /> <br />5. Non-Federal interests provide lands, easements, rights-of-way and <br />dredged material disposal. <br /> <br />6. Non-Federal interests perform all relocation of utilities except <br />in the case of a deep draft harbor or project constructed by <br />non-Federal interests in which case 1/2 of the cost of relocation <br />is borne by owner of utility. <br /> <br />B. Operation and Maintenance(O&M) <br /> <br />Federal government pays for 100~ of O&M except for deep-draft <br />harbors where non-Feds pay 50~ of incremental cost of O&M for that <br />portion of project with a depth greater than 45 feet, <br /> <br />C. Erosion or Shoaling Attributable to Federal Navigation Works <br /> <br />Costs of projects or measures to prevent or mitigate for erosion <br />and shoaling resulting from Federal navigation works will be cost <br />shared in same proportion as cost sharing provisions applicable <br />to navigation project. Non-Federal interests are required to <br />maintain such projects. <br /> <br />. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.