Laserfiche WebLink
<br />Preliminary Flood Insurance Study, Feb 13, 1984 <br /> <br /> <br />City of Colorado Springs, City Engineering Division Review Comments <br /> <br />Panel No.8 <br /> <br />Panel No. 9 <br /> <br />Panel No. 10 <br /> <br />Panel No. 13 <br /> <br />Panel No. 14 <br /> <br />Panel No. 15 <br /> <br />Panel No. 19 <br /> <br />Panel No. 20 <br /> <br />The private road designation should be changed to read <br />Allegheny Drive. <br /> <br />The Corporate Centre development channelization is <br />nearing completion and is recommended that this panel <br />be amended accordingly. Data concerning the channeliza- <br />tion has been submitted to the FEMA office previously. <br /> <br />City Street mapping is incomplete in this panel. <br /> <br />The City Engineering Division disagrees with the flood- <br />way and floodplain limits shown on this panel due to <br />recent channelization in Pinon Valley Subdivisions No.1, <br />2, 3 and 4 during the time period 1980 through 1983. <br />Also, during the same time period, Centennial Industrial <br />Park terrain was over lot graded and portions of the <br />channelization were completed. The subdivision drainage <br />reports on file with the City Engineering Division <br />indicate that the 100 year flood event is contained <br />within the channel. <br /> <br />This panel does not reflect the new bridge construction <br />in 1980, 1981 at Garden of the Gods Road. The bridge <br />construction replaced the narrow watercourse opening <br />indicated on the map with a much wider opening. <br /> <br />A portion of the Corporate Centre development channeli- <br />zation is shown on this panel as well. Refer to the <br />comment for Panel No.9. <br /> <br />The City of Colorado Springs and the State of Colorado <br />are currently finalizing a project extending Union <br />Blvd from Austin Bluffs Parkway to Academy Blvd. The <br />completion date for this project is May of 1984. The <br />project will channelize the 100 year flood and, there- <br />fore, alter the base flood elevations on this panel. <br />Data concerning the design can be made available to you <br />at your request. <br /> <br />Storm sewer and channel construction started in 1983 <br />will be completed in 1984 for a portion of Gouth Douglas <br />Creek affecting the base flood elevations. Data for <br />this design can be furnished to you at your request. <br /> <br />Camp, Dresser & McKee was to check the limits of the <br />floodplain on North Douglas Creek, between Chestnut <br />