Laserfiche WebLink
<br />East l04t.h Avenue <br /> <br />The East 104th Avenue at Staticnj)3+90 at. present has no cul- <br /> <br /> <br />vert at the point where the proposed First (~reek channel crosses the <br /> <br /> <br />road\/ay. A new bridge has been provided uncler the roadway to pass the <br /> <br /> <br />100-~rear flow without overtopping. ThiC I,nclge ",ill have two spans of <br /> <br />36.0' each wit.h a height of 8.0'. Ripra~ rl~olection is provided on the <br /> <br /> <br />bed to protect. the bridge foundations. <br /> <br />!.,,-~~~state Hi~~ 76 <br /> <br />The highway at Station l71+40 ba" five CMP's of varying sizes <br /> <br /> <br />whictl have to be dismantled. To pass thE 1()O-year flow without over- <br /> <br /> <br />topping the highway, a new box culvert bridge has been provided. This <br /> <br />will consist of four barrels each 14.0' , ]0.0'. Suit.able upstream and <br /> <br /> <br />down~;tream transitions have been provided al_ong with rip rap as shown in <br /> <br />t.he drawing. The upstream bed in a length of l]O feet has been steepen- <br />ed and provided with riprap. <br /> <br />In te r ~ ta te Highway ~Lt-,)-.2'}l.Ei"-fl_~an~Ll. .)~ r.a~"J,Il.8.s~~.l7,I~~(I...h3 <br /> <br />In this reach the First Creek has. wlcle flood pLain. The creek <br /> <br /> <br />will be channelized to carry the 100-year fL()~ a. shown in the drawings. <br /> <br /> <br />First Creek in this reach is crossed by Havana Street at Station 187+80, <br /> <br /> <br />the Burlington Ditch at Station 203+40 and the O'Brian Canal at Station <br /> <br /> <br />216+40. New structures are needed at these locations. <br /> <br />Havana St reet <br /> <br />The Havana Street. crossiIlg h;lS no ogerlings under the roadway <br /> <br /> <br />at pl"esent. It is propose(1 to provide a hri,dge at the crossing to pass <br /> <br /> <br />lhe ],OO-year f'low without overtopping. ~rhp bridge will have two spans <br /> <br /> <br />each of 35.0' with a depth of 8.5!. 'file roadway will not be raised. In <br /> <br /> <br />order to keep the invert of t.he bridge at E.I. 5,086.0, the upstream bed <br /> <br />of the channel will be st.eepened for a length DE ]]0 feet and provided <br /> <br /> <br />with a 1.5' drop as shown in the drawing. for obtaining proper flow <br /> <br /> <br />condi tions upstream and dOvlIlstream trans i ti ems ]];:tve been provided. <br /> <br />II [-5 <br />