My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06000
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:57 AM
Creation date
10/5/2006 1:56:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Adams
Community
Aurora, Arapahoe County
Stream Name
First Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
3/1/1977
Prepared For
Arapahoe County
Prepared By
Engineering Consultants
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Burling..1:on Di tch <br /> <br />The Burlington Ditch crosses the wide flood plain of First <br /> <br /> <br />CreE~k without a drainageway across it" ThE' ditch is designed to carry <br /> <br />300 cfs. It is proposed t_o provi,de an opert {'lullle for the ditch with the <br /> <br /> <br />Fint Creek flowing below. The flume wIll b,> 8.33' "ide and 5.0' deep. <br /> <br />The depth of flow in the flume will be 4.0 <br /> <br />The flume will cross the <br /> <br />First Creek channel over two pieL~; with t_hr'ee ~;pans each of 52.0r. The <br /> <br /> <br />First Creek flood channel side slopes in this reach has been steepened <br /> <br /> <br />frorr 4H:IV to 2H:IV. The side slopes will be stabil.zed with riprap in <br /> <br /> <br />this reach. <br /> <br />O'Brian Canal <br /> <br />The First Creek channeliza1.ion wilJ, t:erminate at the O'Bri,an <br /> <br />Canal. The flow in the First Creek will enter the O'Brian Canal and <br /> <br /> <br />will be discharged over a side channel s~lJlway into the flood channel <br /> <br /> <br />as shown. The side channel spillway desigr\ will be carried out by <br /> <br /> <br />Farmers Reservoir and Irrigation Compiiny and wi,),l be designed to pass <br /> <br /> <br />the 100-year flow. The proposed First Creck channel downstream of <br /> <br /> <br />O'Brian Canal as provided w{11 be modIfied after the side channel .pill- <br /> <br /> <br />"ay is finalized. <br /> <br />o ' Brian C ana Do_9Ji..1:il~''.':.n~J~' ])r:a",~IIL.L~,,--n_(LL4. <br /> <br />In this reach the First Creek will Tlot be channelized except be- <br /> <br />twee.l Burlington Railroad at Station 218--80 to Highway 2 at. Station <br /> <br /> <br />220+10, which has been designed to pass the 100-year flow. Pipe inlet. <br /> <br /> <br />will be provided in the flood channel banks to drain the area betl>'een <br /> <br /> <br />the railroad and Highway 2. Upstream of Hi.'5hway 2, the creek has been <br /> <br /> <br />channelized for a distance of 500 feet for Low [lows in order to provide <br /> <br /> <br />suitable entrance conditions to the Higlmay 2 bridge. The 100-.year <br /> <br /> <br />flood plain limit under future conditio"" just downstream of 96t.h Avenue <br /> <br /> <br />will be influenced by the flow conditio"" upstream of 96t.h Avenue. At <br /> <br /> <br />present flood plain information immediatE~ly upsLream of 96t.h Avenue is <br /> <br /> <br />not available. The diking immediately uf'st"earn of 96th Avenue ",ill <br /> <br />IU.-b <br />
The URL can be used to link to this page
Your browser does not support the video tag.