Laserfiche WebLink
<br />Jeanne M. Boyle <br />Civil EngineerlHydrologist <br /> <br />Mcl""~ghlln Water Engineers. Ltd. <br /> <br />EXPERIENCE <br />Ms. Boyle is responsible for conducting hydrologic and hydraulic studies for drainage master plans. <br />outfall studies. and floodplain reports. She has designed channels, culverts, detention ponds, and <br />storm sewers and has been responsible for the preparation of design reports, construction drawings, <br />specifications, and engineer's estimates and for reviewing drainage studies and construction plans by <br />other engineering firms. <br /> <br />RELATED PROJECT EXPERIENCE <br /> <br />Project, Client, <br />and Location <br /> <br />Drainage Study Reviews <br />Superior Metropolitan District Nil: I <br />Superior, Colorado <br /> <br />Goose Creek <br />City of Boulder <br />Boulder, Colorado <br /> <br />Tributary RB-3 East and West <br />Stream Stabilization Improvements <br />Superior Metropolitan District Nil I <br />Superior. Colorado <br /> <br />School Site Stann Sewer <br />Superior Metropolitan District N2 I <br />Superior, Colorado <br /> <br />Rock Creek Rehabilitation - Indiana <br />Street to Coalton Road <br />Superior Metropolitan District Nll 1 <br />Superior, Colorado <br /> <br />Indiana Street and Mount Sapris <br />Parkway <br />Superior Metropolitan District N2 1 <br />Superior, Colorado <br /> <br />Valmant Park <br />City of Boulder <br />Boulder, Colorado <br /> <br />Catamount Ranch <br />Johnson, Kunkel & Associates <br />Steamboat Springs, Colorado <br /> <br />STD BIG <br /> <br />Position <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />R"sPolIsibilities <br /> <br />Work includes reviewing developer's drainage studies and <br />construction plans for confonnance with the Rock Creek <br />master drainage plan. <br /> <br />Design of parking lots adjacent to Goose Creek channel <br />improvements and hydraulic analysis for two grouted boulder <br />drop strucutures in Goo~e Creek. <br /> <br />Design of stream stabilization measures along 2,000 L.F. of <br />Tributary RB-3 East IUld. 1,200 L.F. of Tributary RB-3 West, <br />including ten grouted boulder check structures, five concrete <br />cutoff walls, one low-flow crossing, buried riprap bank <br />stabilization at selected locations with existing steep and <br />eroding banks, and gravel and concrete access trails. <br /> <br />Design of 830 L.F. of 48" to 54" RCP storm sewer, including <br />a 19' high drop box manhole and outfall to a detention pond. <br /> <br />Design of stream stabilization measures along 1,200 L.F. of <br />Rock Creek, including three grouted boulder check structures. <br />300 L.F. of low-flow channel restoration, buried riprap bank <br />stabilization at one location with existing steep and eroding <br />banks, and a 1,200 L.F. concrete access trail. <br /> <br />Design of a 60" RCP outlet structure and outlet pipe for the <br />Hillside Storage detention pond. Work included the concrete <br />outlet structure, a trash rack, a 20' high drop box manhole, and <br />the hydraulic analysis of the outlet stllJcture. <br /> <br />Preliminary site grading. detention pond sizing, and hydrology <br />analysis for a proposed park site in Boulder, including parking <br />lot and roadway grading, a bridge, and three detention pond <br />layouts. <br /> <br />Preliminary culvert sizin.g for roadway improvements for a <br />proposed subdivision, including a hydrology analysis. <br />