My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05784
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:50:12 PM
Creation date
10/5/2006 1:47:52 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Floodplain Study Review and Designation program - SOQ
Date
4/1/2000
Prepared For
State of Colorado
Prepared By
Montgomery Watson
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br />e <br />o <br />. <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />G <br />f) <br />. <br />o <br />o <br />Q <br /><<> <br />o <br />c <br />Ci <br />. <br />. <br />Ci <br />C <br />. <br />o <br />., <br />o <br />., <br /><<> <br />e <br />o <br />. <br />o <br />., <br />o <br />o <br />e <br />o <br />. <br />o <br />o <br />. <br />. <br />o <br />. <br />. <br />o <br />o <br />. <br />o <br />. <br /> <br />", <br /> <br /> <br />Project Engineer - Steve lowry, P.E. <br /> <br />Mr. Lowry will share Project Engineering responsibilities for the Floodplain <br />Study Revicw and Designation Program. Mr. Lowry has 28 years of <br />professional experience and has worked on many projccts along the <br />Front Range relatcd to hydrology, hydraulics and floodplain mapping. <br />He has completcd detailcd and approximate Flood Insurance Studies <br />for FEMA for Woodland Park, Tcller County, Wintcr Park, Grand County, <br />and parts of Arapahoc County and Douglas County. Hc has also <br />complcted several projccts for the UDFCD that required floodplain <br />analysis, such as the Eastlakc Reservoir in Thornton, West Toll Gate Crc'ck <br />in Aurora, and rehabilitation work on tributaries to Big Dry Creek in <br />Westminster. <br /> <br />Time Availability <br /> <br />The percent of time available to commit to the Floodplain Study and <br />Designation Program is given below. This rcprcscnts averagc time <br />availability over a one-year period beginning in June of this ycar. <br /> <br />Chip Paulson <br /> <br />Georgc Slovensky <br /> <br />Jerry Gibbens <br /> <br />Stevc Lowry <br /> <br />Project Manager <br />Project Engineer <br />Project Engineer <br />Project Engineer <br /> <br />20% <br />25% <br />25% <br />20% <br /> <br />This level of availability is more than adequatc to mcet thc rcgular <br />deadlines anticipatcd for this projcct. Our support staff mcmbers will be <br />available to work on this project at levels of up to 75% as needed to <br />perform tasks in the areas of mapping, graphics and report production. <br /> <br />17 <br /> <br />CWCB FLOODPLAIN STUDY REVIEW AND DESIGNATION PROGRAM <br /> <br />MONTGOMERY WATSON <IIJ) <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.