My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05088
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:13 PM
Creation date
10/5/2006 1:15:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Arvada
Stream Name
Hidden Lake, Bates Lake
Basin
South Platte
Title
Major Drainageway Planning
Date
11/1/1975
Prepared For
Urban Drainage and Flood Control District, Arvada and Adams County
Prepared By
Hydro-Triad, LTD.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1-5 <br /> <br />Construct 590 LF of revet mattress lined open channel (30' easement) <br />with check drops and 60 LF of 8' x 6' RCBC at 64th Avenue. 100 <br />year flood protection is obtained. <br />Reach 6 -- 64th Avenue to Crestview: construct 440 LF of revet <br />mattress lined open channel (40' easement). Construct 825 LF <br />of 90" RCP within Lowell Blvd. ROW with drop manhole at the <br />Manhart Ditch. 100 year flood protection is obtained. <br />Reach 7 -- Crestview to Clear Creek: construct 225 LF of 90" RCP <br />under Lowell Blvd. (10 year flood protection). Construct 350 <br />LF of open channel to Pomponio Lake. Construct spillway from <br />Pomponio Lake to Lake sangraco (100 year flood protection). <br />Construct spillway from Lake sangraco to Clear Creek (100 year <br />flood protection). Construct 350 LF of special street-cross- <br />section for Lowell Blvd. as part of scheduled improvements to <br />prevent overflow from entering Crestview Pond (100 year flood <br />protection). <br />Reach 8 -- D & RGW Railroad to Clear Creek: status quo, except <br />floodplain zoning <br />2. Plan B - Bates Lake Planning Basin <br />Major and local detention facilities, channelization, no <br />additional major conduits. <br />Plan B proposes to enforce the current drainage codes of the City <br />of Arvada where storm runoff from a development is not to exceed <br />historic runoff values. Seventy percent effectiveness of "local" <br />detention in reducing developed flows to historic flows has been <br />assumed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.