My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05088
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:13 PM
Creation date
10/5/2006 1:15:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Arvada
Stream Name
Hidden Lake, Bates Lake
Basin
South Platte
Title
Major Drainageway Planning
Date
11/1/1975
Prepared For
Urban Drainage and Flood Control District, Arvada and Adams County
Prepared By
Hydro-Triad, LTD.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1-3 <br /> <br />4. Prepare a Phase 8 report to restate the decision reached in <br />Phase A and to report all calculations, studies and results <br />used to consummate the analysis. The report is to consist <br />of two volumes; one containing the narrative description and <br />the other consisting of plan and profile drawings reduced to <br />11" x 18". <br />C. Selected Alternative <br />The recommended plan of the Phase A analysis was the Modified Plan <br />E for the Hidden Lake Basin and Plan B for the Bates Lake Basin. These <br />plans were reviewed by U.D. & F.C.D., Adams County and Arvada and <br />accepted for Phase B preliminary design. During the design phase, <br />the required easement for the open channel proposed for the reach <br />from 64th Avenue to the Crestview pond would not allow sufficient <br />setback for the houses along Lowell Boulevard. In addition, the <br />required length of revet mattress lined channel from Hidden Lake to <br />64th Avenue was reduced, since a grass lined channel was found to <br />be sufficient. Therefore, Modified Plan E was revised to include a <br />shorter length of revet mattress lined channel and the additional <br />length of 90" RCP. A schematic of the plan used for Phase B is <br />presented in Figure I-I and a reach-by-reach description is presented <br />herein: <br />1. Modified Plan E - Hidden Lake Planning Basin <br />Improvement to Hidden Lake, no upstream improvements but use of <br />floodplain zoning and regulation, downstream channel improvements, <br />utilization of Lake Sangraco for storm water detention. <br />
The URL can be used to link to this page
Your browser does not support the video tag.