My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05088
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:13 PM
Creation date
10/5/2006 1:15:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Arvada
Stream Name
Hidden Lake, Bates Lake
Basin
South Platte
Title
Major Drainageway Planning
Date
11/1/1975
Prepared For
Urban Drainage and Flood Control District, Arvada and Adams County
Prepared By
Hydro-Triad, LTD.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I , <br />I I <br />I <br /> <br />the 100 year recurrence interval values was defined and presented <br />in the Phase A report. Other alternative plans were defined and <br />discussed as to advantages and disadvantages. <br />The Phase A report was submitted to the U.D. & F.C.D. on June <br />18, 1975. The report was reviewed by the participating entities and <br />a notice to proceed on the Phase B design of the recommended alter- <br />natives was received on July 30, 1975. The purpose of the Phase B <br />portion of the study can be summarized as follows: <br />Prepare a preliminary design of the subject drainage courses for <br />the selected alternative plan. The design shall be of adequate detail <br />to permit U.D. & F.C.D., Arvada and Adams County to properly plan <br />bridges and culverts for new vehicular thoroughfare construction. <br />The plan shall also be in sufficient detail to permit the acquisition <br />of needed channel right-of-way and to permit the planning of new sub- <br />divisions and buildings with full knowledge of future channel and <br />floodplain locations and characteristics. The drawings shall also <br />show the plan and profile of the 100 year floodplain under existing and <br />improved channel conditions for fully developed flows, in sufficient <br />detail to allow administration of the floodplain regulations. The <br />scope of work included the following: <br />1. Prepare final hydrologic and hydraulic studies to determine the <br />magnitude and volume of the storm runoff to be subsequently used <br />in the preliminary design of drainage facilities of the selected <br />alternate plan. <br />2. Prepare preliminary design of the drainage facilities on 1" = <br />100' plan and profile maps with a contour interval of two feet. <br />3. Prepare a detailed cost estimate of the proposed improvements <br />for Arvada, Adams County and the total drainageway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.