My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05064
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:08 PM
Creation date
10/5/2006 1:13:47 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
205
County
Larimer
Community
Fort Collins
Basin
South Platte
Title
Master Drainageway Planning - Cooper Slough, Boxelder Creek, Fort Collins, Larimer County, Colorado
Date
8/1/1981
Designation Date
1/1/1983
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Table 41. Summary of Cost Estimates for Alternative 2 <br />for 50-Year Design Frequency. <br /> <br />Table 42. summary of Cost Estimates for Alternative 2 <br />for 100-Year Design Frequency. <br /> <br />I <br /> <br />Item Total Cost <br /> <br />Item Total Cost <br /> <br />I <br /> <br />Channelization Cooper Slough, Reach 1 <br /> <br />$1,114,900 <br /> <br />Channelization Cooper Slough, Reach 1 <br /> <br />$1,427,400 <br /> <br />I <br /> <br />Channelization Cooper Slough, Reach 2 <br /> <br />1,556,000 <br /> <br />Channelization Cooper Slough, Reach 2 <br /> <br />1,799,300 <br /> <br />pond West of Cooper Slough <br /> <br />950,400 <br /> <br />Pond West of Cooper Slough <br /> <br />950,400 <br /> <br />I <br /> <br />Channelization, Boxelder Creek, Reach 1 <br /> <br />1,340,900 <br /> <br />Channelization, Boxelder Creek, Reach 1 <br /> <br />1,340,900 <br /> <br />I <br /> <br />TOTAL COST <br /> <br />$4,962,200 <br /> <br />TOTAL COST <br /> <br />$5,51B,000 <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/B percent <br /> <br />$ 377,100 <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />$ 419,400 <br /> <br />Operation and Maintenance <br /> <br />11,400 <br /> <br />Operation and Maintenance <br /> <br />I <br /> <br />11,400 <br /> <br />TOTAL ANNUAL COSTS <br /> <br />$ 38B,500 <br /> <br />TOTAL ANNUAL COSTS <br /> <br />$ 430,800 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />84 <br /> <br />85 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.