My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05064
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:08 PM
Creation date
10/5/2006 1:13:47 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
205
County
Larimer
Community
Fort Collins
Basin
South Platte
Title
Master Drainageway Planning - Cooper Slough, Boxelder Creek, Fort Collins, Larimer County, Colorado
Date
8/1/1981
Designation Date
1/1/1983
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Table 39. Alternative 3, Cooper Slough Reach 1 Quantity and <br />Cost Estimate for Channel from State Highway 14 <br />to Boxelder Creek. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Table 40. summary of Cost Estimates for Alternative 2 <br />for 10-Year Design Frequency. <br /> <br />I <br /> <br />I <br /> <br />Item Quantity Unit Cost <br />Excavation 13,360 cubic yards $ 3 <br />Concrete 600 cubic yards 250 <br />Fill 2,100 cubic yards 2 <br />Seeding 106,000 square feet 0.08 <br />Diversion <br />structure 1 each 2,000 <br />Trickle channel 2,000 linear feet 34 <br />41x12' box culvert 30 feet 600 <br />Riprap 75 cubic yards 50 <br />Fencing 1,000 linear feet 16 <br />TOTAL CONSTRUCTION COST <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />Land (4 acres @ $20,000) <br /> <br />I <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />Operation and maintenance <br /> <br />I <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br /> Total <br /> $ 40,100 <br /> 150,000 <br /> 4,200 <br /> 8,500 <br /> 2,000 <br /> 68,000 <br /> lB,OOO <br /> 3,800 <br /> 16,000 <br /> $292,600 <br /> 102,400 <br /> 80,000 <br /> 23,800 <br /> $498,800 <br /> 37,900 <br /> 1,900 <br />$ 39,800 <br /> <br />I <br /> <br />Item <br /> <br />Total Cost <br /> <br />I <br /> <br />Channelization Cooper Slough, Reach 1 <br /> <br />$ 790,300 <br /> <br />I <br /> <br />Channelization Cooper Slough, Reach 2 <br /> <br />955,500 <br /> <br />Pond West of Cooper Slough <br /> <br />950,400 <br /> <br />I <br /> <br />Channelization, Boxelder Creek, Reach 1 <br /> <br />1,340,900 <br /> <br />I <br /> <br />TOTAL COST <br /> <br />$4,037,100 <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />$ ~06,800 <br /> <br />Operation and Maintenance <br /> <br />11,400 <br /> <br />I <br /> <br />TOTAL ANNUAL COSTS <br /> <br />$ 318,200 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />82 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />83 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.