Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Table 37. Alternative 3, Cooper Slough Reach 2 Detention Storage <br />Quantity and Cost Estimate, State Highway 14. <br /> <br />I <br /> <br />Table 38. Alternative 3, Cooper Slough Reach 2 Detention Storage <br />Quantity and Cost Estimate, Upstream of Colorado <br />and Southern Railroad. <br /> <br />I <br /> <br />Item, <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />I <br /> <br />I <br /> <br />Excavation 136,000 cubic yards <br />Fill 2,000 cubic yards <br />Trickle channel 1,128 linear feet <br />Riprap 400 cubic yards <br />48 inch diameter CMP 100 linear feet <br />Asphalt 300 tons <br />Seeding 650,000 square feet <br />TOTAL CONSTRUCTION COST <br /> <br />0.08 <br /> <br />$ 3 <br /> <br />I <br /> <br />34 <br /> <br />I <br /> <br />50 <br /> <br />I <br /> <br />40 <br /> <br />20 <br /> <br />I <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />I <br /> <br />Land (14.9 acres @ $20,000) <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />I <br /> <br />Operation and maintenance <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br />2 <br /> <br /> Total <br />$ 408,000 <br /> 4,000 <br /> 3B,400 <br /> 20,000 <br /> 4,000 <br /> 6,000 <br /> 52,000 <br />$ 532,400 <br /> 186,300 <br /> 298,000 <br /> 50,800 <br />$1,067,500 <br /> Bl,OOO <br /> 900 <br />$ 81,900 <br /> -- <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br />il <br /> <br />Item Quantity Unit cost <br />Excavation 92,500 cubic yards $ 3 <br />Fill 24,000 cubic yards 2 <br />Trickle channel 1,500 linear feet 34 <br />Riprap 300 cubic yards 50 <br />Culverts: 2-4'x7' 80 linear feet 700 <br />1-4'x10' 40 linear feet 550 <br />Seeding B30,000 square feet 0.08 <br /> <br />I <br /> <br />'I <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />I <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />I <br /> <br />Land (19 acres @ $5,000) <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br />I, <br />I <br /> <br />TOTAL COST <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />I <br /> <br />Operation and maintenance <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />BO <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />81 <br /> <br />I <br /> <br /> Total <br /> $277,500 <br /> 48,000 <br /> 51,000 <br /> 15,000 <br /> 56,000 <br /> 22,000 <br /> 66,400 <br /> $535,900 <br /> 187,600 <br /> 95,000 <br /> 40,900 <br /> $B59,400 <br /> 65,200 <br /> 1,140 <br />$ 66,340 <br />