Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Table 35. Alternative 2, Cooper Slough Reach 2 Quantities and <br />cost Estimate for 50-Year Design Channel Improvement. <br /> <br />I <br /> <br />Table 36. Alternative 2, Cooper Slough Reach 2 Quantities and <br />Cost Estimate for 100-Year Design Channel Improvement. <br /> <br />, <br /> <br />I <br /> <br />I <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />Total <br /> <br />I <br /> <br /> Total <br />$ 108,900 <br /> 26,400 <br /> 224,400 <br /> 31,700 <br /> 20,000 <br /> 91,200 <br /> 44,000 <br /> 60,000 <br /> 360,000 <br />$ 966,600 <br /> 383,300 <br /> 132,000 <br /> 74,100 <br />$1,556,000 <br /> 118,100 <br /> 3,300 <br />$ 121,400 <br /> <br />Item Quantity Unit Cost <br />Excavation 36,300 cubic yards $ 3 <br />Fill 13,200 cubic yards 2 <br />Trickle channel 6,600 linear feet 34 <br />Seeding 396,000 square feet 0.08 <br />Riprap 400 cubic yards 50 <br />Drop structure 2 each 45,600 <br />Culverts: 2 - 4' X 12' 40 linear feet 1,100 <br /> 3 4' x 10' 40 linear feet 1,500 <br /> 3 6' x 8' 200 linear feet 1,800 <br /> <br />I <br /> <br />Item <br /> <br />I <br /> <br />I <br /> <br />Excavation 62,700 cubic yards $ 3 <br />Fill 19,800 cubic yards 2 <br />Trickle channel 6,600 linear feet 34 <br />Seeding 528,000 square feet 0.08 <br />Riprap 400 cubic yards 50 <br />Drop structure 3 each 45,600 <br />Culverts: 3 - 4' x 10' 40 linear feet 1,500 <br /> 4 - 4' x 10' 40 linear feet 1,900 <br /> 3 - 6' x 8' 200 linear feet 1,800 <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />. <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />. <br /> <br />Engineering & contingencies (35 percent of construction cost) <br /> <br />Land (13.2 acres @ $10,000) <br /> <br />Land (16.5 acres @ $10,000) <br /> <br />I <br /> <br />Fiscal, legal and administration (5 percent of construction, <br />nee ring & contingencies, & <br /> <br />engi- <br />land) <br /> <br />I <br /> <br />Fiscal, legal and administration (5 percent of construction, engi- <br />neering & contingencies, & land) <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />TOTAL COST <br /> <br />I <br /> <br />Annual Cost: 50-year life, 7-3/8 percent <br /> <br />'. <br /> <br />Annual Cost: 50-year life, 7-3/B percent <br /> <br />Operation and maintenance <br /> <br />Operation and maintenance <br /> <br />I <br /> <br />TOTAL ANNUAL COST <br /> <br />I <br /> <br />TOTAL ANNUAL COST <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />7B <br /> <br />79 <br /> <br />. <br /> <br />I <br /> <br />$ 188,100 <br /> 39,600 <br /> 224,400 <br /> 42,200 <br /> 20,000 <br /> 136,800 <br /> 60,000 <br /> 76,000 <br /> 360,000 <br />$1,147,100 <br /> 401,500 <br /> 165,000 <br /> <br />85,700 <br /> <br />$1,799,300 <br /> <br />136,600 <br /> <br />3,300 <br /> <br />$ 139,900 <br />