Laserfiche WebLink
<br />.' <br /> <br />r <br /> <br />" <br /> <br />Mr. Sheldon Boone <br />February 5. 1990 <br />Page t.wo <br /> <br />The design points for the flood hydrologic study on Spring <br />Creek are: <br /> <br />o Upstream of County Road No. 90 for the Pierce stream reach <br /> <br /> <br />o Upstream of the north Town limits for the Nunn stream <br /> <br />reach <br /> <br />We would recommend that the hydrology study be performed <br />using the SCS watershed rainfall-runoff model. The results of <br />these hydrologic analyses shoUld be presented to the Town and <br />the CWCB in a formal report with all applicable technical <br />back-up data and documentation. <br /> <br />On behalf of the Town of Pierce and this Board. we look <br />forward to working with the SCS on this much needed floodplain <br />management project. Should the SCS need to make a change in <br />the Colorado FY 90 floodplain management studies program to <br />implement this reguest. I recommend that you do so. <br /> <br />Sincerely. <br /> <br />M <br /> <br />J. William McDonald <br />Director <br /> <br />JWM/LFL/gl <br />Enclosure: as stated <br />cc: Mike Ketterling <br />Lois Souther <br />