My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04950
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:47 PM
Creation date
10/5/2006 1:08:30 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
54
County
Jefferson
Community
Unincorporated Jefferson County
Stream Name
Lena Gulch
Basin
South Platte
Title
Pleasant View Drainage Study
Date
11/1/1975
Designation Date
3/1/1976
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(4) Reach No. L,: Orchard Street to Pike Street <br /> <br />The fence:; and stored materials ~;J"hich impede the storm <br />runoff within the laO-year flooding limits be removed. <br /> <br />A drainage easement "auld be dedicated to the COllnty <br />which would define the uses of the flood drainage-way <br />that would be allm,ed. <br /> <br />The rear lot areas would be graded to accomodate the <br />lOa-year storm runoff. This grading would be a .large <br />swale as opposed to a channel so that the mmer would <br />retain use of his property. <br /> <br />The area '5raded would be re-sodded, ane. thE~ maintenanCE~ <br />of the flood limits would rest ,dth the lot mmer. <br /> <br />The culvert under Pike Street would be replaced by a <br />eulvert h~ving a lOO-year storm capacity. There would <br />be a major realignment of the system location due to <br />existing residences and hydraulic. considerELtions. <br /> <br />A latera.l system within Pike Stneet and. terminating at <br />Old Golde~ Road would be installed. <br /> <br />(5) Reach No.5: Pike Street to Quaker Street <br /> <br />The purch~se of the duplex inunediately \Vest of Pike <br />Street will not be necessary due to the construction <br />of the Detention Pond No.4. <br /> <br />The fences and stored materials which impede the storm <br />runoff within the laO-year flood limits be removed. <br /> <br />A drainage easement would be dedicated to the COllnty <br />which would define the uses of the flood drainage-"ay <br />that wouli be allo"ed. <br /> <br />The rear lot areas would be graded to accomodate the <br />lOa-year storm runoff. This gra.ding would be a large <br />s"ale as opposed to a channel so that the O\1Iler would <br />retain use of his property. <br /> <br />The area graded ,<auld be re-sodded or hydro-mulched and <br />regular m~intenance would be the responsibility of the <br />owner. <br /> <br />The culvert under Quaker Street ,.,ould be enlarged to <br />accomodate a lOa-year storm runoff rate controlled by <br />the detention pond as recommended belo~r in Alignment "D". <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.