Laserfiche WebLink
<br />Cost Estimate .For J:,)an-I <br /> <br />(Levee for West-Side and East-Side Floodplains) <br /> <br />Item <br /> <br />1. Levee Embankment <br /> <br />2. Road Closures: <br />Rowe Ave. (East Side <br />3' tall) <br />Main Street (East <br />Side 5' tall) <br /> <br />3. 48 Inch Culverts <br /> <br />4, Seeding Levee <br /> <br />5. Embankment <br />Protection <br /> <br />6. Fencing <br /> <br />7. Channel Cleaning <br /> <br />8. Asphalt Pavement <br /> <br />9. Pierce Lateral <br />Embankment <br /> <br />* <br /> <br />Quantity <br /> <br />45,000 <br /> <br />50 <br /> <br />10 <br /> <br />1. 500 <br /> <br />3,600 <br /> <br />3,000 <br /> <br />2,500 <br /> <br />5,000 <br /> <br />VEil. <br /> <br />Uni t C.ost <br /> <br />Con <br /> <br />$119,250 <br /> <br />12,000 <br /> <br />15,000 <br /> <br />3,000 <br /> <br />10,000 <br /> <br />45,000 <br /> <br />7,600 <br /> <br />3.500 <br /> <br />6,250 <br /> <br />11,250 <br /> <br />$232,850 <br />37,250 <br />$270,100 <br /> <br />Total cost does not include real estate or right-at-way <br />cost. <br /> <br />-9- <br /> <br />C,Y. <br /> <br />$;1..25 <br /> <br />1 <br /> <br />L.. S. <br /> <br />1 <br /> <br />L..S. <br /> <br />I:"t, <br /> <br />L, S. <br /> <br />M: <br /> <br />1.000 <br /> <br />c.y, <br /> <br />30 <br /> <br />Ft.. <br /> <br />2.00 <br /> <br />C.Y. <br /> <br />1. 50 <br /> <br />S.Y. <br /> <br />!i .00 <br /> <br />C.Y. <br /> <br />2.25 <br /> <br />Sub-total <br />16 'l; Contingency <br />Tota1* <br />