Laserfiche WebLink
<br />Cost Estimate For Plan II <br /> <br />(East-Side Floodplain) <br /> <br />Item Quantity 110;[ to 110i L~;.c)st Cost <br />1. Levee Embankment 27,200 C., Y. $2,25 $ 61. 200 <br />2 . Road Closures: <br /> Main Street (2' tall ) I L.S. 15,000 <br />3. 48 Inch Culverts 30 Ft. L,S. 2,000 <br />4. Seeding Levee 5 AC 1,000 5,000 <br />5. Embankment <br /> Protection 1,500 C.Y. 30,000 45,000 <br />6. Channel Excavation 5,000 C.Y. 2.00 10,000 <br />8. Asphalt Pavement 2,500 S. Y. 5.00 _lb2Q_Q <br /> S'ub-total $150,700 <br /> IS % Contingency 22,600 <br /> Total* $173,300 <br /> <br />* <br /> <br />Total cost does not include real estate or right-of-way <br />cost. <br /> <br />Ibj <br /> <br />-10- <br />