|
<br /> SUMMARY
<br /> TABLE Zf
<br /> STATE OF Cll.OllAOO
<br /> STREAI1BANl( EROSION STOOV
<br /> COST ESTIMATE - CQlPARIS(Jj OF BENEfITS AI() COST (00 liars) (I)
<br /> - --------
<br /> Structural Mea5ure, Construction Engineering Project land Total 08 M A"erag' Tohl Ave nge
<br /> V.g.t.tl.. Sprig Cost Adalnlatratlon Rlghh tnAtlllatlon Annual I AVlfagl Annuil Annu.1
<br /> Study Area R8Y1t.ent (5%) Cost : Cost with O&M Benefits
<br /> . (2) (3) (4) (5)
<br /> .
<br /> . .
<br /> .-----------------------------------------------------------------------------------------------------------------------------------------,
<br /> Ft $ $ $ . $ ~ $ $ $ .
<br /> --------------------------------------- --------------------------------------------------------------------------------------------------,
<br /> CUHant Creek 7,300 42,705 5,919 7,260 0 55,944 2,100 .4,910 7,010 0
<br /> Dolores Riv.,.. 29,790 174,272 24,398 29 ,626 0 m,296 8,700 20,030 28,730 0
<br /> Elk River 7,300 42,705 5,979 7,260 0 55,944 2,100 4,910 7,010 0
<br /> Kerber Creek 31,600 184,860 25,881 31,428 0 242,167 9,200 21,675 30,675 0
<br /> lake fork 22,100 129,285 18,099 21,977 0 169,361 6,500 14,860 21,360 0
<br />N little Tho.pson
<br />N Ri"er 48,270 2B2,3B4 39,535 48,005 0 369,924 14,100 32,450 46,350 0
<br /> Lower fountain
<br /> Creek 2,720 15,912 2,m 2,705 0 20,845 BOO 1,730 2,630 0
<br /> North Fork
<br /> Gunnison 7,100 41,335 5,814 7,064 0 54,413 2,100 4,810 7,010 0
<br /> Unco.pahgn
<br /> River 10,100 59,085 8,272 10,044 0 77,401 2,900 6,790 9,690 0
<br /> White River 11,100 64,935 9,092 11 ,038 0 85,065 3,300 7,480 10,780 0
<br />
<br />I-------------------------~------------------------------------------------------------------------------------------------------------------------___--,
<br />
<br />: Total
<br />
<br />177 ,380
<br />
<br />1,037,678
<br />
<br />145,277
<br />
<br />176,405
<br />
<br />o
<br />
<br />1,359,360 : 51,800 :
<br />
<br />, .
<br />,------------------------------------------------------------------------------------------------------------------------------------------------------------,
<br />
<br />(1) Price Base: Septe_ber 1987 ~ortized at 8 5/8% for 50 years
<br />(2) Installed' $5 per foot of bank protected (10 ft. on each side of strea. channel or 20 ft. for one side -
<br />sprigs set at approxi.ately two foot centers) with a lif. expectancy of 50 years
<br />(3) Corps of Engineers 404 per.it to Nork in river and eas...nt fro. landowner
<br />(4) Includes cost for structural ..asures to protect riparian habitat and 5X O&H
<br />(5) Benefits !or riparian habitat protection were not analvzed
<br />
|