Laserfiche WebLink
<br /> <br />SUMMARY <br />TABLE Z6 <br />STATE IF ctl..ORADO <br />STREAMBANK EROSION STUDY <br />COST ESTIMATE - ClJIOI'ARISON IF BEJlEFITS AND COST lOo II.rs) C1) <br /> <br />,------------------------------------------------------------------------------------------------------------------------------------------------------------: <br /> <br />Structural Measures <br />Ripuian Zone <br /> <br />Construction <br />Cost <br /> <br />Ensineerin9 <br /> <br />Project <br />Ad.i n i stn,t i on <br /> <br />Land <br />Rishts <br /> <br />Total 0&" <br />Insh.llation <br /> <br />Study Area <br /> <br />(510 <br /> <br />Averi.S_ <br />Annual <br />Cost <br /> <br />Tota.l <br />Avera.91!' Annua.l <br />Cost with O&M <br />(4) <br /> <br />Averi.S. <br />Annuill <br />Slmll!'f i ts <br />(5) <br /> <br />(2) <br /> <br />(3) <br /> <br />:------------------------------------------------------------------------------------------------------------------------------------------1 <br /> <br />Ft <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />------------------------------------------------------------------------------------------------------------------------------------------------------------~ <br /> <br /> Currant Creek 7,300 17,082 2,39Z 2,904 0 ZZ,378 900 1,960 Z,B60 0 <br /> Dolores River 29,790 69,708 9,760 11,851 0 91,319 3,400 8,010 11,410 0 <br /> Elk River 7,300 17 ,082 2,391 2,904 0 22,:rn 900 1,960 2,B60 0 <br /> Kerber Creek 31,600 73,942 10.352 12,571 0 96,865 3,700 8,490 12,190 0 <br />N lake Fork 22,100 '51,714 7,241 8,791 0 67,746 2,600 5,950 8,550 0 <br />W <br /> Little Thollpson <br /> River 48,270 112,953 15,813 19,201 0 147,967 5,600 12,990 18,590 0 <br /> Lower Founta.in <br /> Creek 2,720 6,365 891 1,082 0 8,338 400 720 1,120 0 <br /> North Fork <br /> Gunnison 7,100 16,614 2,330 2,827 0 21,771 1,100 1,900 3,000 0 <br /> UncoMpahsre <br /> River 10,100 23,634 3,309 4,018 0 30,961 1,100 2,700 3,800 0 <br /> White River 11,100 25,974 3,636 4,416 0 34,02:6 1,400 2,980 4,380 0 <br /> <br />1------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> <br />Total <br /> <br />177,380 <br /> <br />415,068 <br /> <br />58,115 <br /> <br />70,565 <br /> <br />o <br /> <br />543,748 <br /> <br />~ 21,100 : <br /> <br />:------------------------------------------------------------------------------------------------------------------------------------------------------------: <br /> <br />(1) Pric@ Base: SepteMber 1987 aMortized at 85/8X for 50 years <br />(2) Zooe to extend 50-100 feet up bank - $2 per foot of bank protected with a life expectancy of 50 years <br />(3) Corps of Ensineers 404 permit to work in river and easeMent froll landowner <br />(4) Includes cost for structural Measures to protect riparian habitat and 5X O&M <br />(5) Benefits for riparia.n habitat protection were not analyzed <br />