Laserfiche WebLink
<br /> <br />SU"MARY <br />TAILEZE <br />STATE OF COLORADO <br />STREAMBAN< EROSION STUDY <br />COST ESTIMATE - COMPARISON OF BENEFITS AND COST (Dollars) (II <br /> <br />,------------------------------------------------------------------------------------------------------------------------------------------------------------: <br /> <br />(2XI <br /> <br />Aver-~ge <br />Annual <br />Cost <br /> <br />Totl-I <br />A,veril9@ Annual <br />Cost wi th 0&" <br />(41 <br /> <br />Averilge <br />Annual <br />Benefih <br />(5) <br /> <br />Study Area <br /> <br />Structural Measures <br />Buffer- Strip <br />(Vegeh,hdJ <br />(2) <br /> <br />Construction <br />CO'.it <br /> <br />Engineerins <br /> <br />Project Land lotI. I <br />: Administration : Ri9ht~ : Installation: <br />, I' . <br />. <br /> <br />0&" <br /> <br />(31 <br /> <br />_______________________________________ ______________________________________________________------------------------------------7-------------------------, <br /> <br />Ft <br /> <br />s <br /> <br />s <br /> <br />s <br /> <br />s <br /> <br />s <br /> <br />s <br /> <br />$ <br /> <br />($) <br /> <br />(S) <br /> <br /> Currant Creek 1,300 <br /> Dolores River- 29,790 <br /> Elk River 7,300 <br /> Kerber Creek 31,600 <br /> Lake Fork 22,100 <br /> Li tt I e Tholllps(ln <br /> River 48,210 <br />N Lower Fountain <br />.... Creek 2,720 <br /> NOrth Fork <br /> Gunnison 1,100 <br /> Uncollpilhgre <br /> River 10,100 <br /> Nhih' RivH 11,100 <br /> <br />85,410 11,951 14,519 0 111,886 1,100 9,190 11,490 0 <br />348,543 48,196 59,252 0 456,592 6,900 40,020 46,920 0 <br />85,410 11 ,957 14,520 0 111,887 1,600 9,810 11,410 0 <br />369,760 51,761 62,853 0 484,338 7,300 0 0 0 <br />254,570 36,200 43,956 0 338,725 5,200 29,100 34,900 0 <br />564,159 79,066 96,009 0 739,834 11,300 64,850 76,150 0 <br />31,824 4,455 5,410 0 41,689 600 3,650 4,250 0 <br />83,010 11 ,630 14,122: 0 108,822 1,400 9,550 10,950 0 <br />118,170 16,544 20,089 0 154,803 2,400 13,560 15,960 0 <br />129,870 18,182 22.,018 0 170,130 2,600 14,910 17,510 0 <br /> <br />--------------------------------------- ---------------------------- --------------------------------------------------------------------------------------- <br /> <br />,------------------------------------------------------------------------------------------------------------------------------------------------------------: <br /> <br />Total <br /> <br />lIT ,380 <br /> <br />2,075,346 <br /> <br />290,548 <br /> <br />352,809 <br /> <br />o <br /> <br />2,718,703 I 41,000 : <br /> <br />(1) Price Bilse: SepteMber 1981 aMortized at 8518% for 50 yelrs <br />(2) Buffer Strip (vegetated) installed @ _0.10 per sq. ft. (50 ft. on each side of stream or 100 ft. for one side) <br />for a totill of 100 sq. ft. for each foot of streall or _10 per foot of stream with il life expectilocy of 50 years <br />(3) Corps of Engineers 404 per.it to work in river and easelllent frOM landowner <br />(4) [ncludes cost for structural lleilSUres to protect riparian habitat and zr. 0&" <br />(5) Benefits for riparian habitat protection were not analyzed <br />