Laserfiche WebLink
<br />Directions: <br /> <br />i '--- <br />I <br />I <br />, <br />I <br /> <br />1 Foot Sandbag Expedient Levee <br />i <br />i <br />I <br /> <br />~ <br /> <br />1. Dig Key Trench Approximately 6' Deep and 18" Wide <br />2. Line Key Trench with Poly on W ter Side <br />3. Anchor Poly in Key Trench with ndbags <br />4. Place Sandbags in Alternating R ws Staggering Joints Between Rows <br />Open End of Bag Facing Downst eam Anchored by Next Bag Placed on <br />Top and Tamped Into Place <br />5. When Appropriate Height is Rea hed, Drape Poly Over Sandbag Line <br />Anchor Poly with Additional San bags <br /> <br />Side View <br /> <br />trl <br />, <br />'" <br /> <br />I <br />I <br />N~te:. Stack Sandbags Neatly in Alternating Rows! <br /> <br />Use 3 to 1 Bas 1Height Ratio <br />(9 Foot Base13 Foot Height) A h P I W'th S db <br />I ncor oy I an ags <br />I <br /> <br /> <br />Drape Poly On <br />/ Water Side <br /> <br />Anchor Poly in Key Trench <br />