Laserfiche WebLink
<br />Mudbox Cap <br />Approx. Construction Time: 4 Hours <br /> <br />Materials for 1000 Linear Feet: <br /> <br />Personnel & Equipment:* <br />Personnel: <br /> <br />500 each 2" x 4" x 8' Posts <br /> <br />500 each 2' x 4" x 6' Anchor Posts <br /> <br />1 Foreman (Sector Leader) <br />6 Team Leaders <br />225 Workers <br /> <br />500 each 2" x 4" x 7'Braces <br /> <br />500 each 2" x 4" x 6'8" Braces <br /> <br />Tools and Equipment: <br /> <br />5 Axes <br />12 Claw Hammers <br />8 Mauls (Post) <br />200 Shovels <br />180 Wheelbarrows <br />1 Chain saw w/5 gal Fuel, Oil, <br />Spare Chain <br />6 Saws (Crosscut - Hand) <br />1 Plow <br />Lighting Equipment as Needed <br /> <br />*For use where earthmoving <br />equipment cannot be used. <br /> <br />312 sheets 7/8" Plywood <br />437 Ibs. 10d Common Nails <br />375 Ibs. 16d Common Nails <br /> <br />1000 L.F. 8 ft., 6 mil Poly <br />925 cu. yds. Clay Earthfill <br /> <br />E - 8 <br />