Laserfiche WebLink
<br />3 Foot Sandbag Expedient Levee <br />Approx. Construction Time: 4 Hours <br /> <br />Materials for 1,000 Linear Feet: <br /> <br />Personnel & Equipment: <br />Personnel: <br /> <br />50,000 Sandbags <br />840 Tons Sand (wet weight) <br />1000 L.F. 20 ft. wide, 6 mil Poly <br />63 Sandbag Filling Stations <br /> <br />1 Foreman (Sector Leader) <br />6 Team Leaders <br />500 Workers* <br /> <br />*Assumes 50 ft. Max. Gang Line <br />Tools and Equipment: <br /> <br />144 Shovels <br /> <br />Lighting Equipment as Needed <br /> <br />Optional Equipment: <br /> <br />125 Pallets** <br />6 Fork Lift Trucks <br />1 Front End Loader (Sand <br />Moving Equipment) <br />1 18" Backhoe (For Key Trench) <br />Pallet Transport Vehicles <br /> <br />**Assumes 4 Trips/Hour <br /> <br />E - 10 <br />