My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04418
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:10 PM
Creation date
10/5/2006 12:38:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 1
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br />-6- <br /> <br />5) Measurement of quantities <br /> <br />6) Insurance of proper rock placement <br /> <br />7) Keep photographiC and daily report records of <br />construction progress and submit such records weekly <br />to the State. <br /> <br />8) <br /> <br />Assist the <br />the project <br />evaluation <br />action. <br /> <br />State in any claim disputes related to <br />construction by preparing a documented <br />and recommendation for the State's <br /> <br />9) Provide the State with one set of reproducible <br />record (as built) drawings. Such drawings shall be <br />based upon construction records provided by the <br />consultant during the construction. <br /> <br />10) Be available to furnish engineering services and <br />consultation necessary to correct unforeseen project <br />operation difficulties for a period of one year <br />after the date of statement of substantial <br />completion of the facility. <br /> <br />B. Estimated cost is $28,000 for a 60 working day <br />construction period as indicated on the work schedule. <br />Extra costs will be based on hourly rates approved by <br />the state for additional time required beyond that <br />schedule. When the contractor is responsible for the <br />delay any additional cost should be covered by liqui- <br />dated damages. <br /> <br />3. Modifications of the Oxford Avenue Boatchutes <br /> <br />a. This phase includes all work necessary for engineered <br />improvements to both upper and lower Boatchutes located <br />near Oxford Avenue for improved boating safety and for <br />compatibility with other boat chutes in the area. <br /> <br />SpecifiC work items include: <br /> <br />1) As built surveys and detailed mapping of the upper <br />drop structure. Surveying and mapping of the lower <br />drop structure was done as a part of Wright Water <br />Engineers study for the Brown Ditch Boatchutes and <br />will be utilized on this project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.