Laserfiche WebLink
<br />-. <br /> <br />. <br /> <br />. <br /> <br />-7- <br /> <br />2) Engineering design and drawings showing proposed <br />modifications to the structures for inclusion in the <br />Union Avenue Dam construction contract. <br /> <br />3) Resident Engineering and inspection of construction <br />work related to this work item including working <br />with the contractor on detailed rock placement for <br />improved boatability and safety. <br /> <br />b. Cost for this work item will be $10,000 <br /> <br />VI. SUMMARY OF PROJECT COSTS <br /> <br />A. Basic Services <br /> <br />1. <br />2. <br />3. <br /> <br />Preliminary Design <br />Final Design <br />Construction Contract Administration <br />SUBTOTAL <br /> <br />$ 8,000 <br />51,500 <br />15,000 <br />$74,500 <br /> <br />B. Special Services <br /> <br />1. Model Observation <br />2. Resident Engineering/Inspection <br />3. Oxford Avenue Boatchute <br />SUBTOTAL <br /> <br />$ 9,000 <br />~ <br />,000 <br />$47,000 <br /> <br />GRAND TOTAL <br /> <br />$121,500 <br /> <br />VII. INSURANCE <br /> <br />A. The engineer agrees to maintain in full force and effect and <br />in sufficient monitory amount errors and omissions or <br />professional liability insurance policy for the duration of <br />this contractual work. <br />