My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04418
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:10 PM
Creation date
10/5/2006 12:38:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 1
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />UNION AVENUE DAM MODIFICATIONS <br />WORK PLAN <br /> <br />Wright Water Engineers will commence work immediately upon receiving a <br />notice to proceed. Our scope of work is as described below. <br /> <br />SCOPE OF WORK <br /> <br />Professional engineering services will be provided in an efficient and <br />methodical manner for the design and construction of retrofit modifications <br />to the existing dam structure and river channel of the South Platte River <br />at the Union A venue Dam seven miles downstream of Chatfield Reservoir. <br />The primary purpose of the work is to improve public safety. <br /> <br />I. PRELIMINARY DESIGN <br /> <br />A. This phase involves establishment of the general layout size and <br />scope of the project. and its exact location on the site. The <br />preliminary engineering services will include: <br /> <br />1. Consultation with the CWCB, clarification and definition of <br />the project requirements, review of available data, and <br />decisions on scheduling of construction. Conferences may <br />also be held as required with approving regulatory agencJes, <br />the City of Englewood, City of Sheridan, Urban Drainage and <br />Flood Control District and the USACE. <br /> <br />2. Advice to CWCB about necessary field information to be <br />furnished by CWCB or obtained from others. These special <br />services may include additional geotechnical information, <br />landscape design, land boundary surveying. field instrument <br />surveying, aquatic (fisherles), zoning, deed, and other land <br />use restriction information; and environmental assessment <br />statements in case a 404 permit is needed. <br /> <br />3. Estimate of probable costs for the project. Due to <br />conditions beyond Wright Water Engineer's control, these <br />estimates cannot be guaranteed. <br /> <br />4. Preparation and submittal to CWCB of preliminary drawings <br />clearly showing design layout, elevations and details of the <br />proposed improvements. <br /> <br />5. Analysis of existing utilities and Englewood intake. <br /> <br />6. Structural analysis of existing dam structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.