Laserfiche WebLink
<br /> <br />-' ^ <br /> <br />. <br /> <br />. <br /> <br />-2- <br /> <br />2. Revision of the approved alternate to incorporate <br />modifications desired in the August 22 meeting and results <br />of the field instrument survey data. <br />3. Preparation of exhibit boards and graphics to present the <br />alternate to the CWCB board. <br />4. Calculations and data preparation defining parameters and <br />requirements for the hydraulic model and model study <br />required for the project. <br />5. Consultation with representatives of the Bureau of <br />Reclamation laboratory for preparation of the work plan for <br />modeling. <br />6. Attendance at and presentation of the selected alternate to <br />the CWCB board. <br /> <br />II. REIMBURSEMENT <br /> <br />Reimbursement for this project will be based on actual hourly rates, <br />pI us expenses as inc.urred. The total billings will not exceed the <br />limits previously discussed with the CWCB. <br /> <br />The final billings are anticipated to be: <br /> <br />Phase A <br />Phase B <br /> <br />$12,000 <br />$ 8,000 <br /> <br />831.036.08C <br />1.26 <br />cjb <br />