My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04325
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:33:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Rules and Regulations for Dam Safety and Dam Construction
Date
9/30/1988
Prepared For
State of Colorado
Prepared By
State of Colorado DNR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9.~.(4) The engineer shall give the State Engineer at least <br />five day~ advance notice to allow inspection of the cutoff trench and <br />outlet foundation. <br /> <br />9.B.(S) Change orders shall be submitted In accordance with <br />Rule 9 .A. (B). <br /> <br />9,B.(6) The engineer shall give the State Engineer at least <br />10 days advance written notice of the engineers final construction <br />lnspectlon. <br /> <br />9.B.(7) The engineer shall notify the State Engineer of the <br />completion of the construction In accordance with Rule 10. <br /> <br />g.C. For minor Class 11 and large, Intennedlateand S.al1 dams <br />rated as Class III, the owner shall provide an engineer experienced ln <br />dam design and construction, who shall be responsible for the <br />following: . <br /> <br />9.C.(I) Not less than 30 days prior to construction or as <br />soon as possible for dams whose construction season is affected by <br />freezing weather, the engineer shall notify the State Engineer in <br />writing of the date construction will begin, the name of the engineer <br />In charge of the project, and the name of the contractor; <br /> <br />9.C.(2) The engineer shall observe. or provide for the <br />observation by a technician the construction work on the da., .the <br />cutoff trench, and outlet works foundation to see that they are in <br />substantial accordance with the approved plans. The engineer shall <br />endeavor to guard against defects and deficiencies In the construction <br />of the dam, and shall disapprove Or reject work failing to conform to <br />the approved plans and specifications; <br /> <br />9.C.(3) Periodic tests shall be taken and inspections made. <br />Periodic progress reports shall be submitted as requested by the State <br />Engineer. The engineer. shall compile a record of all tests con- <br />ducted, and any problems and remedies, for submittal to the State <br />En9ineer at the end of construction; <br /> <br />9.C.(4) Change orders shall be submitted in accordance with <br />Rule 9.A. (8); <br /> <br />g.C.(S) The engineer shall give the State Engineer at least <br />10 days advance written notice of the project engineers final con- <br />struct.ion inspection; and <br /> <br />9.C.(6) The engineer shall notify the State Engineer of the <br />completion of construction in accordance with Rule 10. <br /> <br />- 34 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.