My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04268
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:46 PM
Creation date
10/5/2006 12:30:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 2
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4.2.8 Control of Submittals: The Contractor shall carefully control his . <br />procurement operations to assure that each individual submittal is made on or <br />before the corresponding date scheduled on his approved "SUBMITTAL REGISTER." <br /> <br />4.2.9 Submittal Form: The SUBMITTAL FORM attached to this Section shall <br />be used for submitting the Category II submittals, in strict accordance with <br />the instructions on the reverse side thereof. This form shall be reproduced <br />by the Contractor. The instructions on the back need not be reproduced on <br />the copies used by the Contractor in forwarding the submittals. This form <br />shall be properly completed by filling out all the heading blank spaces and <br />identifying each item submitted. Special care shall be exercised to insure <br />proper listing of the specification paragraph and sheet number of the <br />contract drawings pertinent to the data submitted for each item. A separate <br />Submittal Form (MRO 1644) shall be attached to each copy of the data being <br />submitted . <br /> <br />4.2.10 Approval Action: Submittals may be required for "Approval" or for <br />"Information Only." Within the terms of the General Provisions Clause <br />entitled "SHOP DRAWINGS," all required Category II submittals submitted for <br />"Approval" are considered to be "shop drawings." All Category II submittals <br />submitted for "Information Only" are not considered to be "shop drawings." <br />Upon approval, the pertinent data will be identified as having received <br />approval by being so stamped and dated. Two copies of Category II submittals <br />will be returned to the Contractor except for samples, test cylinders and O&M <br />manuals for which two copies of the SUBMITTAL FORM only will be returned to <br />the Contractor. Submittals for "Information Only" will not be returned to <br />the Contractor. No Corps of Engineers approval action will be required prior <br />to incorporating these items into the work. These Contractor approved <br />submittals will be used to verify that material received and used in the job <br />is the same as that described and approved and will be used as record copies. <br />Delegation of this approval authority to the Contractor Quality Control does <br />not relieve the Contractor from the obligation to furnish material conforming <br />to the plans and specifications and will not prevent the Contracting Officer <br />from requiring removal and replacement if nonconforming material is incor- <br />porated in the work. Nor does it relieve the Contractor from the requirement <br />to furnish samples for testing by the Government laboratory or check testing <br />by the Government in those instances where the technical specifications so <br />prescribe. <br /> <br />4.2.11 Meaning of Approvals: Approval of the submittals by the <br />Contracting Officer or his authorized representatives shall not be construed <br />as a complete check, but will indicate only that the general method of <br />construction and detailing is satisfactory. Approval will not relieve the <br />Contractor of the responsibility for any error which may exist as the <br />Contractor shall be responsible for the dimensions and design of adequate <br />connections, details and satisfactory construction of all work. After <br />submittals have been approved by the Contracting Officer or his authorized <br />representatives, resubmittal for substitution of materials or equipment will <br />not be given consideration unless accompanied by an acceptable explanation as <br />to why a substitution is necessary. <br /> <br />. <br /> <br />. <br /> <br />lA-6 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.