My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04268
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:46 PM
Creation date
10/5/2006 12:30:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 2
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />print and five (5) sets of all catalog data and descriptive literature will <br />be retained by the Contracting Officer and the drawing reproducible and two <br />sets of catalog data and descriptive literature will be returned to the <br />Contractor. <br /> <br />i <br /> <br />4.2.4.2 Category II: Submittals may be required for "Approval" or for <br />"Information Only." Within the terms of the General Provisions Clause <br />entitled "SHOP DRAWINGS," all required Category II submittals submitted for <br />"Approval" are considered to be "shop drawings." All Category II submittals <br />submitted for "Information Only" are not considered to be "shop drawings." <br />Two copies of Category II submittals will be returned to the Contractor <br />except for samples, test cylinders and O&M manuals for which two copies of <br />the SUBMITTAL FORM only will be returned to the Contractor. Submittals for <br />"Information Only" will not be returned to the Contractor. No Corps of <br />Engineers approval action will be required prior to incorporating these items <br />into the work. These Contractor approved submittals will be used to verify <br />that material received and used in the job is the same as that described and <br />approved and will be used as record copies. Delegation of this approval <br />authority to the Contractor Quality Control does not relieve the Contractor <br />from the obligation to furnish material conforming to the plans and <br />specifications and will not prevent the Contracting Officer from requiring <br />removal and replacement if nonconforming material is incorporated in the <br />work. Nor does it relieve the Contractor from the requirement to furnish <br />samples for testing by the Government laboratory or check testing by the <br />Government in those instances where the technical specifications so <br />prescribe. <br /> <br />4.2.5 Meaning of Approvals: Approval of the submittals by the Contracting <br />Officer or his authorized representatives shall not be construed as a <br />complete check, but will indicate only that the general method of <br />construction and detailing is satisfactory. Approval will not relieve the <br />Contractor of the responsibility for any error which may exist as the <br />Contractor, under the Contractor Quality Control requirements of this <br />contract, shall be responsible for the dimensions and design of adequate <br />connections, details and satisfactory construction of all work. After <br />submittals have been approved by the Contracting Officer or his authorized <br />representatives, resubmittal for substitution of materials or equipment will <br />not be given consideration unless accompanied by an acceptable explanation as <br />to why a substitution is necessary. <br /> <br />. <br /> <br />4.2.6 When Not Approved: The Contractor shall make any corrections <br />required by the Contracting Officer or his authorized representatives and <br />promptly furnish a corrected submittal in the form and number of copies as <br />specified above. If the Contractor considers any correction indicated on the <br />submittals to constitute a change to the contract, notice as required under <br />the GENERAL PROVISIONS paragraph entitled "Changes" should promptly be given <br />to the Contracting Officer. <br /> <br />4.2.7 Withholding of Payment: Payment for materials incorporated into the <br />work will not be made if required approvals have not been obtained. <br /> <br />. <br /> <br />lA-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.