My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03947
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:49 PM
Creation date
10/5/2006 12:12:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
Local Drainage
Basin
South Platte
Title
Floodplain Information Report
Date
10/1/1982
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />'" <br /> <br />Table 14. Lola P..rk Tributary Alt..rnative A4 SUrronaryof Cost Esti....te. <br /> <br />Table 15 continued. <br /> <br />n_ <br /> <br />Quantity <br /> <br />Total Cost <br /> <br />UTlitCost <br /> <br />Item <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />Total Cost <br /> <br />sase grade preparation <br />Iume Avenue <br />Josephine Avenue <br /> <br />5,200<:y <br />5,600 <:y <br /> <br />Concrete pavement <br />curb and qutter <br />Irene"'"en"e <br />Josephine Avenue <br /> <br />1,740"y <br />1,740<:y <br /> <br />Lawn replacement <br />Iro",..A""n,,e <br />Josephine Avenue <br /> <br />20,300 af <br />20,300 sf <br /> <br />Channel from Irene <br />Avenue to Ur.. <br />station pOnd <br /> <br />120lf <br /> <br />Total Construotion Cost <br /> <br />Engineering and Contingenoies <br />130 percent of construction costs) <br /> <br />uegal. Fiscal and Administration <br />15 peroent of construction, engineering and <br />contingencies. and land coete} <br /> <br />'roTA!, COST <br /> <br />1,nn\l41Cost <br />(50-year service lir<l, 7-3/apercent) <br /> <br />Operation and Maintenance <br /> <br />TO'rA,t. ANNUJIJ., COST <br /> <br />$4.50/"y <br />$4.50/oy <br /> <br />Annual Cost <br />(50-year service life, 7-3/8 percent) <br /> <br />$19,500 <br /> <br />$23,000 <br />25,000 <br /> <br />,"0 <br /> <br />Operation and ~intenance <br /> <br />TOTIl.LANNl}~COST <br /> <br />$20,100 <br /> <br />$95.00/cy <br />$95.00/cy <br /> <br />i <br />, <br /> <br />165,000 <br />165,000 <br /> <br />$0.35/af <br />$0.35/sf <br /> <br />7,000 <br />7,000 <br /> <br />S15.00/sf <br /> <br />2,000 <br /> <br />$394,000 <br /> <br />118,000 <br /> <br />26,000 <br /> <br />$538,000 <br /> <br />$40,800 <br /> <br />o <br /> <br />$40,800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.