Laserfiche WebLink
<br />" <br /> <br />'" <br /> <br />Table 14. Lola P..rk Tributary Alt..rnative A4 SUrronaryof Cost Esti....te. <br /> <br />Table 15 continued. <br /> <br />n_ <br /> <br />Quantity <br /> <br />Total Cost <br /> <br />UTlitCost <br /> <br />Item <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />Total Cost <br /> <br />sase grade preparation <br />Iume Avenue <br />Josephine Avenue <br /> <br />5,200<:y <br />5,600 <:y <br /> <br />Concrete pavement <br />curb and qutter <br />Irene"'"en"e <br />Josephine Avenue <br /> <br />1,740"y <br />1,740<:y <br /> <br />Lawn replacement <br />Iro",..A""n,,e <br />Josephine Avenue <br /> <br />20,300 af <br />20,300 sf <br /> <br />Channel from Irene <br />Avenue to Ur.. <br />station pOnd <br /> <br />120lf <br /> <br />Total Construotion Cost <br /> <br />Engineering and Contingenoies <br />130 percent of construction costs) <br /> <br />uegal. Fiscal and Administration <br />15 peroent of construction, engineering and <br />contingencies. and land coete} <br /> <br />'roTA!, COST <br /> <br />1,nn\l41Cost <br />(50-year service lir<l, 7-3/apercent) <br /> <br />Operation and Maintenance <br /> <br />TO'rA,t. ANNUJIJ., COST <br /> <br />$4.50/"y <br />$4.50/oy <br /> <br />Annual Cost <br />(50-year service life, 7-3/8 percent) <br /> <br />$19,500 <br /> <br />$23,000 <br />25,000 <br /> <br />,"0 <br /> <br />Operation and ~intenance <br /> <br />TOTIl.LANNl}~COST <br /> <br />$20,100 <br /> <br />$95.00/cy <br />$95.00/cy <br /> <br />i <br />, <br /> <br />165,000 <br />165,000 <br /> <br />$0.35/af <br />$0.35/sf <br /> <br />7,000 <br />7,000 <br /> <br />S15.00/sf <br /> <br />2,000 <br /> <br />$394,000 <br /> <br />118,000 <br /> <br />26,000 <br /> <br />$538,000 <br /> <br />$40,800 <br /> <br />o <br /> <br />$40,800 <br />