Laserfiche WebLink
<br />Table 10 <br />Preliminary Cost EstimlltEI <br />Alternative No.3 <br />Detentictn Dam In Upstream Basin <br /> <br /> Item Unit <br />1. General <br /> Mobilization LS <br /> Traffic Control LS <br />2. Dams (Embankment Fill) <br /> P-1 CY <br /> P-2 CY <br /> P-3 CY <br /> P-4 CY <br /> P-5 CY <br /> P-S CY <br /> P-7 CY <br /> <br />Quan <br /> <br />tity Unit Cost <br /> $50,000 $5 <br /> $50,000 $5 <br />07 $3 $2,3 <br />81 $3 $74 <br />01 $3 $2,0 <br />804 $3 $3,3 <br />0 $3 $2,0 <br />17 $3 $2,0 <br />:~ _ $3 __ $2,0 <br /> <br />Cos;t <br /> <br />1 <br />1 <br /> <br />0,0130 <br />0,0130 <br /> <br />7H6,3 <br />248,4 <br />6H4,9 <br />1,112, <br />694,64 <br />680.5 <br />6'1408 <br /> <br />88,921 <br />5,443 <br />84,703 <br />38,412 <br />83,920 <br />41,551 <br />22,249 <br /> <br />Subtotal <br />15% Contingency <br />Updat,! to 1998 Dollars <br />Subtotal Construction Cost <br /> <br />Engineering Costs (12%) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition (flow easement) <br /> <br />AC <br /> <br />$14,B05,1H9 <br />$2,220,780 <br />$3,064,1576 <br />$20,090,6!i5 <br /> <br />$500 <br /> <br />$2,410,879 <br />$1,004,1533 <br />$1,470,000 <br /> <br />2940 <br /> <br />Total P.oject Cost <br /> <br />$24,976,066 <br />