Laserfiche WebLink
<br />Table 9 <br />Preliminary Cost Estimate <br />Allternative No.2 <br />100-yr. Levees Along Pawnee Cre,ek <br /> <br /> -. <br /> Item Unit ..sl <br /> -- <br />1, General <br /> Mobilization (Max. 5% of Total Cost) LS <br /> LS <br />2, Levees (includes raising CR 33) <br /> Clearing & Grubbing AC <br /> Remove and Replace Topsoil CY 1 <br /> Fill for Levees (includes Ring Levees) CY 4 <br /> Seeding and Revegetation AC <br /> Asphait on CR 33 (540' x 24') SY 'I <br /> Gravel Replacement on Private Drive CY <br />3, Ring Levees <br /> #1 LS <br /> #2 LS <br /> #3 LS <br />3, Install Cuiverts @ U,S. Highway 6 Bridge <br /> Remove Existing Roadway SY <br /> Install (4) 8 Fl x 20 Ft. RCB'S LF <br /> Erosion Control (Type H Riprap) TN <br /> Extend Existing Siphon Structure LS <br />4. Drop Structure <br /> Concrete Cut-off Wall LS <br /> Type M Riprap TN 1 <br /> Type H Riprap TN <br />5, Channel Improvements Downstream of UPRR <br /> Concrete Flood Wall (North Bank) CY 1 <br /> Excavation for Channel CY 9 <br /> Seeding and Revegetation AC <br /> Soil Cement under UPRR CY <br />6, Springdale Ditch Improvements <br /> 6o-inch RCP With Flap Gate LS <br /> <br />11.3 <br />8240.0 <br />6124.0 <br />11,3 <br />440.0 <br />360.0 <br /> <br />150,0 <br />80.0 <br />345.0 <br />1,0 <br /> <br />1,0 <br />05,0 <br />525,0 <br /> <br />90.0 <br />160,0 <br />0.2 <br />750,0 <br /> <br />Subtotal <br />15% Contingency <br /> <br />1,0 <br />1,0 <br /> <br />:y Unit Cost -~ <br /> $50,000 $50,000 <br /> $50,000 $50,000 <br /> $500 $5,650 <br /> $2 $36,480 <br /> $3 $136.372 <br /> $3,500 $39,550 <br /> $12 $17,280 <br /> $15 $5,400 <br /> $16,300 $16.300 <br /> $9,400 $9,400 <br /> $27,600 $27,600 <br /> $4 $600 <br /> $4,650 $372,000 <br /> $35 $12,075 <br /> $20.000 $20,000 <br /> $35,000 $35.000 <br /> $2,0 $3.150 <br /> $30 $15.750 <br /> $500 $95.000 <br /> $3 $27,480 <br /> $3,499 $700 <br /> $20 $15,000 <br />,- $17.500 $17,500 <br /> <br />uantlt <br /> <br />1,0 <br />1.0 <br />1.0 <br /> <br />1.0 <br /> <br />$1,010,287 <br />$151,543 <br /> <br />Total Construction Cost <br /> <br />$1,161,830 <br /> <br />Engineering Costs (12%) <br /> <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition <br />Flow Easement <br /> <br />AC <br />AC <br /> <br />11,3 <br />15,0 <br /> <br />$2,500 <br />$500 <br /> <br />$139,420 <br />$58,091 <br />$28,250 <br />$7,500 <br /> <br />Total Project Cost' $1,395,091 <br />. Does not include planned expansion of Hi~lhway 6 Bridge by COOT, estimated cost = $404.675 <br />