Laserfiche WebLink
<br />Table 8. Vnit Costs for Pawnee Creek Improvements <br /> <br />lkm Unit____ <br /> <br />CosL___ <br /> <br />Mobilization LS <br />Engineering LS <br />Legal/Administration LS <br />Property Acquisition (fee simple) AC <br />Property Acquisition (flow Easement) AC <br />Clearing & Grubbing AC <br />Remove & Replace Topsoil CY <br />Excavation & Fill for Levees CY <br />Riprap TN <br />Seeding for Revegetation AC <br />Structural Concrete CY <br />6" Full Depth Asphalt SY <br />Bridges SF <br />County Road Depression LF <br />Driveway Depression LF <br /> <br />5% of Construction Cost <br />12% of Construction Cost <br />5% of Construction Cost <br />$ 2,500 <br />$ 500 <br />$ 500 <br />$ 2 <br />$ 3 <br />$ 35 <br />$ 3,500 <br />$ 500 <br />$ 12 <br />$ 70 <br />$ 70 <br />$ 30 <br /> <br />These unit costs include both materials, installation, and n~pair of disturbed property. These costs are <br />based upon bid tabulations from similar projects along the front range. <br /> <br />A contingency of 15 percent of the construction cost was added to all'~stimates. This contingency is <br />intended to cover incidental costs that would be associated with these types of projl~cts but are not <br />identified with the conceptual level of details. <br /> <br />Engineering will include design and construction surveying imd was assumed to be 12 percent of total <br />construction costs. <br /> <br />Legal, fiscal, and administration co:;ts were assumed to be 5 percent of the total construction cost. In <br />the following tables are presented the estimated project cost for the Pawnee Creek Improvements <br />Alternative Nos. 2 through 6 respectively. Table 14 presents a summary of the costs for each <br />alternative. <br /> <br />1lI-27 <br />