My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03928
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:46 PM
Creation date
10/5/2006 12:11:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Pawnee Creek
Basin
South Platte
Title
Flood Hazard Mitigation Feasibility Study
Date
2/1/1998
Prepared For
Logan County
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 11 <br />Preliminary Cost Estimate <br />Alternative No.4 <br />Cemetery LI~vee/Channel, Q10lDI = 5000 cfs <br /> <br />Item <br /> <br />1. General <br />Mobilization <br />Traffic Control <br />2. Channels <br />Clearing & Grubbing <br />Remove and Replace Topsoil <br />Overflow chan. east of railroad to S. Platte Riv. <br />Channel south of CR 24 <br />Seeding and Revegetation <br />3. County Road Modifications <br />4. Private Drive Modifications <br />5. Concrete Floodwall <br />Conc. Floodwall south of CR 24 <br />6. Railroad Crossing <br />Box culvert at railroad <br />7. Levees <br />Clearing & Grubbing <br />Remove and Replace Topsoil <br />Earthwork for levee north of CR 24 <br />Seeding and Revegetation <br />Road Closure <br />8. Ditch Crossing <br />Sterling NO.1 Ditch Crossing <br /> <br />Engineering Costs (12%) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition (Channel & Levees) <br /> <br />Unit <br /> <br />LS <br />LS <br /> <br />AC <br />CY <br />CY <br />CY <br />AC <br />LF <br />LF <br /> <br />CY <br /> <br />L" <br />,) <br /> <br />AC <br />CY <br />CY <br />AC <br />LS <br /> <br />LS <br /> <br />Q <br /> <br />uantity Unit Cost C <br />1 $!50,000 $50 <br />1 $!50,000 $50 <br />24 $500 $12 <br />8,720 $2 $77 <br />)3,000 $3 $60! <br />5,000 $3 $15 <br />24 $3,500 $84 <br />300 $70 $21 <br />2000 30 $60 <br />370 $500 $18! <br />1 $450,000 $45( <br />2 $500 $1, <br />3,227 $2 $6, <br />7,500 $3 $22 <br />2 $3,500 $7, <br />1 $;~5, 000 $25 <br />1 $75,000 $75 <br />- <br /> <br />,000 <br /> <br />ost <br /> <br />,000 <br />,000 <br /> <br />3 <br />21 <br /> <br />,000 <br />,440 <br />3,000 <br />,000 <br />,000 <br />,000 <br />,000 <br /> <br />5,000 <br /> <br />),000 <br /> <br />000 <br />454 <br />,500 <br />000 <br />,000 <br /> <br />Subtotal <br />15% Contingency <br /> <br />$1,niO,394 <br />$26;~,559 <br /> <br />Subtotal Construction! Cost <br /> <br />$2,012,953 <br /> <br />AC <br /> <br />$2,500 <br /> <br />$24'1,554 <br />$100,648 <br />$65,000 <br /> <br />26 <br /> <br />TotOlll?roject Cost <br /> <br />$2.420,155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.