My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03800
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:23 PM
Creation date
10/5/2006 12:04:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Development of A Drainage and Flood Control Management Program for Urbanizing Communities - Part I
Date
9/1/1978
Prepared By
CSU Environmental Resources Center
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />47 <br /> <br />within which the devleopment is located. The proportionate contribu- <br />tion for off-site drainage facilities shall be determined by the <br />(name of city or county) and shall be based on an estimate of the <br />hydrologic impact of the development as outlined in Section 21.05.04. <br />The city (or county) may require the owner/developer to pay an off- <br />site drainage fee (ODF) as determined under Section 21.05.04 for the <br />proposed subdivision, or it may require the construction of necessary <br />off-site drainage facilities that traverse through, are adjacent to, <br />or extend beyond the proposed subdivision in lieu thereof, or it may <br />require some combination of fee payment and facility construction. <br />The decision to require off-site construction in lieu of payment <br />shall be based on the construction practicability, the need for the <br />facility, and the ability of the city (or county) to share in the <br />cost of construction as required. The cost of constructing off-site <br />drainage facilities shall be shared by the owner/developer and the <br />city (or county) in accordance with Section 21.05.02(c). <br />(3) Location: All on-site and off-site drainage facilities shall be <br />located in street right-of-way where feasible, or in perpetual unob- <br />structed easements of appropriate width. The city (or county) shall <br />cooperate with and assist owners/developers subject to the provisions <br />of this ordinance in such matters as the exercise of its power of <br />eminent domain for obtaining easement rights for drainage facilities. <br />(b) Procedures: <br />(1) Plans and Specifications: Prior to final approval of a subdiv- <br />ision plat, detailed plans and specifications for the construction <br />and installation of the on-site and off-site drainage facilities as <br />required under this Section 21.05 shall be prepared in accordance <br />
The URL can be used to link to this page
Your browser does not support the video tag.